Home » Products » Overhead Crane » 250 Ton Scrap Charging Overhead Crane

250 Ton Scrap Charging Overhead Crane

250 ton scrap charging overhead crane for steel mill converter charging bay. Heavy-duty A7/A8 grade overhead crane with electromagnetic chuck and scrap grab, designed for grabbing, lifting and feeding scrap steel to converters, featuring high safety, high temperature resistance and customizable parameters.

WhatsappInquiry

The 250 ton scrap charging overhead crane is a heavy-duty, metallurgy-grade overhead travelling crane specially designed for the converter charging bay of steelmaking plants. It serves as the core handling equipment for the steelmaking scrap feeding process, mainly responsible for grabbing, lifting, transporting and tipping scrap steel buckets to complete quantitative and efficient scrap charging for converters. Tailored for the high-frequency, high-intensity and harsh working conditions of steelmaking workshops including high temperature, dust pollution and heavy-load continuous operation, this crane supports flexible switching of auxiliary attachments such as electromagnetic chucks and mechanical scrap grabs, realizing integrated operations of bulk scrap steel grabbing, bucket handling and converter feeding, which greatly improves the automation and efficiency of the steelmaking scrap charging process.

250 Ton Scrap Charging Overhead Crane

250 Ton Scrap Charging Overhead Crane

250 Ton Scrap Charging Overhead Crane Performance Parameters

Parameter Item
Technical Specification
Rated Lifting Capacity
250 Ton (Main Hook)
Working Grade
A7 / A8 (Metallurgical Heavy Duty)
Lifting Height
Customized 24m – 30m
Span
Customized 10.5m – 31.5m
Lifting Speed
0.4 – 10m/min (Variable Frequency Adjustable)
Trolley Traveling Speed
20 – 40m/min (Variable Frequency Adjustable)
Crane Traveling Speed
20 – 40m/min (Variable Frequency Adjustable)
Matching Attachments
Electromagnetic Chuck / Mechanical Scrap Grab
Applicable Environment
High temperature, dust, continuous heavy-load operation

Core Working Application & Matching Attachments

This overhead crane is exclusively applied to the converter charging cross operation area in iron and steel smelting enterprises, covering the whole process from scrap yard material transfer to converter furnace feeding. It can be equipped with two mainstream working attachments according to actual production demands to adapt to different scrap steel handling scenarios:

250 Ton Scrap Charging Overhead Crane

250 Ton Scrap Charging Overhead Crane

With dual-attachment switching capability, the crane can independently complete full-process operations including scrap steel loading from the stockyard, precise transportation of scrap buckets, accurate positioning above the converter and automatic tipping feeding, perfectly matching the continuous and high-efficiency production rhythm of modern steelmaking lines.

Structural Design & Technical Advantages

Adopting heavy-duty double-girder bridge structure and A7/A8 high working grade design, the crane fully meets the long-term continuous heavy-load operation requirements of metallurgical workshops. The main beam is made of high-strength low-alloy steel, which undergoes integral welding, stress relief annealing and precision machining, featuring high rigidity, strong bearing capacity and small deformation, ensuring stable operation under 250-ton rated load for a long time.

250 Ton Scrap Charging Overhead Crane

The lifting mechanism adopts a dual-hoist redundant design with independent main and auxiliary lifting systems. The main hook undertakes heavy-load lifting of scrap steel buckets, while the auxiliary hook assists in bucket tilting, fine positioning and residual material cleaning, realizing collaborative operation and improving feeding accuracy. All walking and lifting mechanisms are equipped with frequency conversion speed regulation systems, enabling smooth start, stop and stepless speed adjustment, effectively preventing load sway and ensuring precise positioning during converter charging.

In view of the harsh metallurgical working environment, the whole machine is designed with high temperature resistance, dust resistance and corrosion resistance. Key components such as motors, reducers and electrical control cabinets adopt industrial high-temperature resistant models, with sealed and dust-proof structures to adapt to high-temperature radiation and dust-filled workshop environments, reducing equipment failure rate and extending service life.

Comprehensive Safety Protection System

As key high-risk equipment for steelmaking production, this 250-ton scrap charging overhead crane is equipped with full redundant safety protection devices to ensure zero-risk operation in heavy-load and high-temperature scenarios:

250 Ton Scrap Charging Overhead Crane Advantages & Value

This 250-ton scrap charging overhead crane integrates high load capacity, high efficiency and high safety, perfectly matching the intensive production mode of modern steel mills. The flexible switching of electromagnetic chuck and scrap grab realizes full coverage of various scrap steel materials, greatly improving scrap feeding efficiency and reducing manual intervention. The high-grade heavy-duty structure and environmental adaptive design ensure stable long-term operation, reduce equipment maintenance frequency and production downtime. The intelligent monitoring and precise control system improve the accuracy of converter charging, stabilize steelmaking quality, and effectively reduce production costs, becoming an indispensable core handling equipment for medium and large steelmaking converter production lines.

FAQ: 250 Ton Scrap Charging Overhead Crane

Q1: What is the main application scenario of the 250 ton scrap charging overhead crane?

A1: This heavy-duty overhead crane is specially customized for the converter charging bay of steelmaking plants. It is mainly used for grabbing, lifting and transporting scrap steel buckets, and completing accurate scrap steel feeding operations for steelmaking converters, adapting to high-frequency, continuous heavy-load operation in harsh steel workshop environments.

Q2: What attachments can this scrap charging overhead crane be equipped with?

A2: It supports two core matching attachments for flexible switching: electromagnetic chucks and mechanical scrap grabs. The electromagnetic chuck is suitable for bulk, fragmented and thin-plate scrap steel rapid grabbing, while the mechanical grab is ideal for large-size, heavy and irregular scrap steel materials, covering all conventional scrap steel handling needs.

Q3: What working grade does this metallurgical scrap charging overhead crane adopt?

A3: The crane adopts A7/A8 heavy-duty working grade, which is the professional standard for metallurgical high-intensity operation. It can adapt to long-term uninterrupted heavy-load work in high-temperature, dusty steelmaking workshops, with strong durability and stable continuous operation performance.

Q4: Does the crane have complete safety protection functions?

A4: Yes. It is equipped with a full set of redundant safety systems, including dual backup brake system, multi-layer limit protection (overload, lifting height, travel limit), real-time intelligent operation monitoring system, load anti-sway system and emergency stop power-off protection device, fully eliminating operation risks in heavy-load metallurgical scenarios.

Q5: Are the parameters of the scrap charging overhead crane customizable?

A5: Core parameters such as lifting height, crane span and operating speed can be customized according to the actual size of the user’s converter workshop and production process requirements, to achieve the best matching with on-site production conditions.

Q6: What environmental adaptability does the equipment have?

A6: All key components adopt high-temperature resistant, dust-proof and sealed anti-corrosion design, which can stably resist high-temperature radiation, workshop dust and harsh industrial environment erosion, effectively reduce failure rate and extend the overall service life of the equipment.

Get Solution & Price Right Now!

We value your feedback! Please complete the form below so that we can tailor our services to your specific needs.

Name:
* Email:
Whatsapp / Phone Number:
Project Location:
* Message:

Latest Comments

Вячеслав Said:
Токосъёмник для крана ЕОТ
Joao Dantas Said:
Hello, We are looking for a replacement wire rope guide for an existing GH / Univiga overhead crane. Available information: * Crane manufacturer: GH / Univiga * Crane capacity: 3.2 tons * Hoist / rope guide reference: GHA12 * Rope guide thread: Left-hand * Approximate outside diameter: 207 mm * Approximate width: 50 mm * Quantity: 1 pc The original GH spare part has a very long lead time, so we are looking for a compatible replacement. It does not need to be an original GH part. A compatible or custom-manufactured rope guide is acceptable, provided that the dimensions, thread direction and installation are suitable for the existing GHA12 hoist. We are currently requesting photos of the original rope guide, drum and crane nameplate from our customer and can send them for your engineering evaluation. Can your company manufacture or supply a compatible wire rope guide for this application? Thank you.
Hak 100ton Said:
Proszę o ofertę na hak 100 ton.
ADRIAN PEÑA Said:
I need hook (double style) capacity 25 metric tons. with 4 sheaves (14" diameter sheaves) wire rope diameter: 5/8"
Tesfaye Melese Said:
40 Ton Double Girder Overhead Crane Trolley Assembly with full Electrical and Mechanical Accessories

Hot Product

Related cases

WhatsApp

Contact Us

Click the button to get product information and quotes on WhatsApp.

GET QUOTE
Whatsapp
Inquiry