A single girder overhead crane is a versatile material handling equipment designed for lifting and moving loads in industrial settings.

A single girder overhead crane is a versatile material handling equipment designed for lifting and moving loads in industrial settings. Composed of a single main beam (girder) supported by end carriages, a trolley, and a hoist, this crane operates on elevated runways, maximizing floor space utilization. Ideal for light to medium-duty applications, it balances cost-effectiveness, compact design, and reliable performance—making it a go-to choice for factories, Kho, and workshops seeking efficient load management.

Our single girder overhead cranes are engineered to meet rigorous industrial demands, with features that set them apart:

|
Tham số
|
Range/Details
|
|
Khả năng nâng
|
0.5 - 32 tấn (customizable for higher capacities upon request)
|
|
Chiều dài nhịp
|
5 - 30 mét (adjustable based on facility dimensions)
|
|
Nâng chiều cao
|
3 - 30 mét (extendable with specialized configurations)
|
|
Lớp lao động
|
A3 – A5 (suitable for medium-duty, intermittent operations)
|
|
Hoist Speed
|
0.8 - 16 m/min (tùy chọn tốc độ thay đổi có sẵn)
|
|
Trolley Travel Speed
|
10 - 30 m/min
|
|
Crane Travel Speed
|
20 - 45 m/min
|
|
Cung cấp điện
|
380V/3PH/50Hz (customizable for 220V, 440V, or other regional standards)
|
|
Hệ thống điều khiển
|
Kiểm soát mặt dây chuyền, điều khiển từ xa (wireless optional), or PLC integration
|

Our single girder overhead cranes excel in diverse sectors, streamlining material handling across:
Q1: What’s the difference between a single girder and cần cẩu dầm đôi?
A1: Single girder cranes use one main beam, are lighter, more affordable, and ideal for light to medium loads. Double girder overhead cranes have two beams, offering higher lifting capacities (32+ tấn) and greater stability for heavy-duty applications.
Q2: Can a single girder overhead crane be installed outdoors?
A2: Yes—we offer weatherproof models with corrosion-resistant coatings, sealed electrical components, and rain shields, suitable for outdoor yards or construction sites.
Q3: How long does installation take?
A3: Installation typically takes 3–7 days, depending on the crane size, site preparation (VÍ DỤ., runway setup), and configuration complexity. Our team provides on-site support for seamless setup.
Q4: What maintenance is required?
A4: Regular maintenance includes checking hoist cables for wear, lubricating trolley/overhead crane wheels, testing safety switches, and inspecting electrical connections. We recommend quarterly inspections for optimal performance.
Q5: Are your cranes compliant with international standards?
A5: Absolutely. All our single girder overhead cranes meet ISO 9001 quality standards, CE certification for EU markets, and OSHA guidelines for safety, ensuring global compatibility.
Chia sẻ với PDF: Tải xuống


Chúng tôi coi trọng phản hồi của bạn! Vui lòng hoàn thành biểu mẫu bên dưới để chúng tôi có thể điều chỉnh các dịch vụ của mình theo nhu cầu cụ thể của bạn.
What is an Overhead Bridge Crane? An overhead bridge crane is a heavy-duty material ha……
Khám phá thêm →
With robust construction and advanced electric drive technology, 10 tons electric hoist ……
Khám phá thêm →
Crane wire rope drum serves as the core of the hoisting and, in some cases, the traversi……
Khám phá thêm →
Nhấp vào nút để nhận thông tin sản phẩm và báo giá trên WhatsApp.
Nhận báo giá
Nhận xét mới nhất