Ev » Ürünler » Havai vinç » 20 Ton tepe vinç: Tek vs. Çift kuşak fiyatı

20 Ton tepe vinç: Tek vs. Çift kuşak fiyatı

A 20 ton overhead crane is a fundamental piece of industrial lifting equipment designed for heavy-duty material handling in workshops, depolar, fabrication plants, çelik fabrikaları, and other industrial settings. It operates on elevated runways, maximizing floor space and providing unparalleled lifting capacity and coverage across a work area. This guide provides a comprehensive look at 20-ton cranes, including types, features, pricing, and specifications.

WhatsappSorgu

20 Ton tek kiriş vs. Double Girder Bridge Cranes

The primary distinction in 20-ton overhead cranes is between single girder and double girder designs. The choice depends on your application’s specific requirements for frequency, span, and duty cycle.

20 Ton Single Girder Overhead Crane

A single girder crane features one main beam (girder) upon which the hoist and trolley travel. The hoist is typically mounted under the girder.

Best For: Applications with lighter duty cycles, shorter spans (typically up to 30 metre), and where cost-effectiveness is a primary concern.

Key Characteristics:

Limitation: Generally not suitable for extremely heavy-duty, continuous (CIC – Continuous Intermittent Cycle) applications or very long spans.

Başvuru

20 Ton Single Girder Electric Overhead Travelling Crane

20 Ton Single Girder Electric Overhead Travelling Crane

20 Ton Explosion Proof Single Girder Overhead Crane

20 Ton Explosion Proof Single Girder Overhead Crane

20 Ton Low Headroom Single Girder Overhead Crane

20 Ton Low Headroom Single Girder Overhead Crane

20 Ton Double Girder Overhead Crane

A double girder crane features two main beams that support a trolley that runs on top of the girders. The hoist is mounted on this trolley.

Best For: Severe-duty applications, longer spans (over 30 metre), higher duty cycles (CIC), and situations requiring maximum hook height.

Key Characteristics:

Limitation: Higher initial cost and weight, and requires more headroom.

Başvuru

20 Ton Double Girder Overhead Crane with Hoist Trolley

20 Ton Double Girder Overhead Crane with Hoist Trolley

20 Ton Grab Bucket Overhead Crane

20 Ton Grab Bucket Overhead Crane

20 Ton Overhead Crane Technical Parameter Table

Parametre 20 Ton Single Girder Crane 20 Ton Double Girder Crane
Kapasite 20 Ton 20 Ton
Span (S) Up to ~30 meters Custom, often over 30 metre
Kaldırma yüksekliği (H) Custom (Örn., 6M, 9M, 12M) Custom (Örn., 9M, 12M, 18M)
Work Duty A3 / FEM 1Am (Light – Moderate) A4-A7 / FEM 2m-4m (Moderate – Severe)
Operating Speed
– Hoisting 8.0 m/min (approx.) 3.3 - 20 m/min (variable frequency drive)
– Long Travel 20-30 m/min (approx.) 20-100 m/min (variable frequency drive)
– Cross Travel 10-20 m/min (approx.) 20-40 m/min (variable frequency drive)
Kontrol modu Pendant Control / Radio Remote Pendant Control / Radio Remote / Cab
Güç kaynağı 3-Phase, 380V/400V/415V, 50Hz/60Hz 3-Phase, 380V/400V/415V, 50Hz/60Hz
Ambient Temperature -20°C to +40°C (Standart) -25°C to +45°C (Standart)

20 Ton Double Girder Overhead Crane

20 Ton Double Girder Overhead Crane

20 Ton Overhead Crane Price

Providing an exact price is impossible without specific project details. A 20 ton overhead crane price is highly variable and depends on:

Price Range: A basic 20 ton single girder overhead crane might start around $15,000 - $25,000, while a custom, large-span, double girder overhead crane can easily exceed $50,000 - $100,000+. Always request a detailed quotation from a supplier.

20 Ton tepe vinç

Delivery Lead Time for a WEIHUA 20 Ton tepe vinç

The delivery lead time for a WEIHUA 20 ton overhead crane is not a fixed number but depends on several key factors related to the project’s complexity and customization. Generally, for a standard specification crane, the lead time ranges from 40 ile 60 working days after the final order confirmation and receipt of down payment.

For more complex or heavily customized projects, the lead time can extend to 60-90 working days or more.

The following table breaks down the typical stages of the process and the factors that influence the timeline:

Stage Estimated Duration (Working Days) Key Influencing Factors
1. Engineering & Technical Clarification 5 - 10 days Crane Type: A standard 20-ton single girder crane requires less engineering than a double girder or customized crane.
Özelleştirme: Special requirements (Örn., special paint, extra safety devices, unique dimensions) lengthen this phase.
2. Procurement of Raw Materials & Components 5 - 10 days Component Brand: Using standard, in-stock components speeds up the process. Specific requests for premium or non-standard brands (Örn., a specific motor or inverter brand) can cause delays.
Material Availability: Market availability of steel and other raw materials.
3. Üretme & Toplantı 15 - 25 days Production Schedule: This is the core production time for fabricating girders, assembling hoists, and building end carriages.
Workshop Workload: Peak seasons can lead to longer queues.
4. Factory Testing & Denetleme (FAT) 3 - 5 days Customer Requirements: If a mandatory Factory Acceptance Test (FAT) is required, it is scheduled in this period.
5. Ambalajlama & Preparation for Shipment 2 - 5 days Packaging Type: Standard export wooden case packaging is typical. Special packaging requirements may take longer.
6. Shipping & Logistics Variable Destination: Domestic shipping within China is fastest. International shipping (by sea or air) depends on the destination port and shipping schedules.
Incoterms: The terms of trade (Örn., FOB, CIF) define who arranges logistics and affects the overall timeline to your site.

20 Ton overhead crane manufacturing process

overhead crane manufacturing process

üretici

WEIHUA Factory

Key Factors That Directly Impact Your Delivery Time

Crane transportation

20 Ton Overhead Crane FAQ

Çeyrek: Which is better for my workshop, a single or double girder 20 Ton tepe vinç?

A: If your usage is occasional, spans are short, and budget is key, a single girder is likely sufficient. For daily, intensive use, long spans, or needing maximum hook height, a double girder is the better, more durable investment.

Çubuk: What maintenance is required for a 20 Ton tepe vinç?

A: Regular inspections are essential. Daily checks by the operator, periodic inspections by a supervisor (monthly/quarterly), and a full annual inspection by a qualified technician are recommended to ensure safety and longevity.

Selecting the right 20-ton lifting equipment is a strategic decision that impacts your operation’s safety, efficiency, and productivity. By understanding the differences between single and double girder cranes, as well as alternatives like gantry and jib cranes, you can make an informed choice. Contact us today for a free consultation and a customized quotation for your 20-ton overhead crane solution.

Çeyrek: How to get a precise delivery date?

A: To receive a firm delivery date, it is essential to provide WEIHUA with your detailed requirements. A formal quotation will include a specific lead time.

For the most accurate and competitive offer, please contact us with your specifications.

We, WEIHUA, are committed to providing high-quality cranes and reliable delivery schedules. We understand that your project timeline is critical and will work closely with you to ensure a smooth process from order to delivery.

WEIHUA Overhead Crane PDF Information: Download

Customers visit factory

Order and sign

Get Solution & Price Right Now!

Geri bildiriminize değer veriyoruz! Hizmetlerimizi özel ihtiyaçlarınıza göre uyarlayabilmemiz için lütfen aşağıdaki formu doldurun.

İsim:
* E -posta:
Whatsapp / Telefon numarası:
Proje Konumu:
* Mesaj:

Son Yorumlar

Sıcak ürün

İlgili Davalar

Whatsapp

Bize Ulaşın

WhatsApp'ta ürün bilgileri ve teklif almak için düğmeyi tıklayın.

Alıntı yapmak
Whatsapp
Sorgu