A single girder overhead crane is a versatile material handling equipment designed for lifting and moving loads in industrial settings.

A single girder overhead crane is a versatile material handling equipment designed for lifting and moving loads in industrial settings. Composed of a single main beam (girder) supported by end carriages, a trolley, and a hoist, this crane operates on elevated runways, maximizing floor space utilization. Ideal for light to medium-duty applications, it balances cost-effectiveness, compact design, and reliable performance—making it a go-to choice for factories, armazéns, and workshops seeking efficient load management.

Our single girder overhead cranes are engineered to meet rigorous industrial demands, with features that set them apart:

|
Parâmetro
|
Range/Details
|
|
Capacidade de elevação
|
0.5 – 32 toneladas (customizable for higher capacities upon request)
|
|
Comprimento do span
|
5 – 30 metros (adjustable based on facility dimensions)
|
|
Altura de elevação
|
3 – 30 metros (extendable with specialized configurations)
|
|
Classe operária
|
A3 – A5 (suitable for medium-duty, intermittent operations)
|
|
Velocidade de elevação
|
0.8 – 16 m/meu (opções de velocidade variável disponíveis)
|
|
Trolley Travel Speed
|
10 – 30 m/meu
|
|
Crane Travel Speed
|
20 – 45 m/meu
|
|
Fonte de energia
|
380V/3PH/50Hz (customizable for 220V, 440V, or other regional standards)
|
|
Sistema de controle
|
Controle pendente, controle remoto (wireless optional), or PLC integration
|

Our single girder overhead cranes excel in diverse sectors, streamlining material handling across:
1º trimestre: What’s the difference between a single girder and ponte rolante de viga dupla?
A1: Single girder cranes use one main beam, are lighter, more affordable, and ideal for light to medium loads. Double girder overhead cranes have two beams, offering higher lifting capacities (32+ toneladas) and greater stability for heavy-duty applications.
2º trimestre: Can a single girder overhead crane be installed outdoors?
A2: Yes—we offer weatherproof models with corrosion-resistant coatings, sealed electrical components, and rain shields, suitable for outdoor yards or construction sites.
3º trimestre: How long does installation take?
A3: Installation typically takes 3–7 days, depending on the crane size, site preparation (Por exemplo, runway setup), and configuration complexity. Our team provides on-site support for seamless setup.
4º trimestre: What maintenance is required?
A4: Regular maintenance includes checking hoist cables for wear, lubricating trolley/overhead crane wheels, testing safety switches, and inspecting electrical connections. We recommend quarterly inspections for optimal performance.
Q5: Are your cranes compliant with international standards?
A5: Absolutely. All our single girder overhead cranes meet ISO 9001 quality standards, CE certification for EU markets, and OSHA guidelines for safety, ensuring global compatibility.
Compartilhar com PDF: Download


Valorizamos seu feedback! Preencha o formulário abaixo para que possamos adaptar nossos serviços às suas necessidades específicas.
The electric chain hoist with trolley is an integrated lifting equipment designed to de……
Descubra mais →
O 10 A ponte rolante de tonelada é uma solução indispensável para manuseio de materiais pesados em ......
Descubra mais →
Clique no botão para obter informações e citações do produto no WhatsApp.
Obtenha cotação
Últimos comentários