Thuis » Blog » 80 Ton-portaalkraan voor betonnen geprefabriceerde balken

80 Ton-portaalkraan voor betonnen geprefabriceerde balken

2026-01-26

80 Ton-portaalkraan voor betonnen geprefabriceerde balken

De 80 ton gantry crane is a professional heavy-duty lifting equipment specially designed and manufactured for the hoisting, transferring, stacking and installation of concrete precast beams in infrastructure projects such as highway bridges, railway bridges, urban overpasses and large-scale industrial plants. As a core lifting tool in the concrete precast beam industry, it integrates reliability, efficiency and precision, and effectively solves the pain points of heavy weight, large volume, high precision requirements and complex operation scenarios of precast beams, providing strong support for improving construction efficiency, ensuring project quality and reducing operation risks.

Product Features of 80 Ton-portaalkraan

80 Ton-portaalkraan voor betonnen geprefabriceerde balken

De 80 ton gantry crane has obvious advantages over ordinary lifting equipment, which is closely related to its scientific structural design and humanized functional configuration, and its features are perfectly adapted to the application needs of concrete precast beams:

Technical Parameters of 80 Ton-portaalkraan

Parameternaam
Specificatie
Rated Lifting Weight
80 ton
Span
18-30M (aanpasbaar)
Hefthoogte
8-16M (aanpasbaar)
Hefsnelheid
0.5-5m/mijn (frequency conversion stepless speed regulation)
Reissnelheid
5-20m/mijn (frequency conversion stepless speed regulation)
Stroomvoorziening
380V, 50Hz, 3-fase (customizable according to regional standards)
Controlemodus
Grondcontrole + afstandsbediening (dual control, optioneel)
Steel Structure Material
Q355B high-strength steel
Werkklasse
A5-A6 (suitable for heavy-duty continuous operation)
Overall Weight
120-180 ton (depending on span and lifting height)

Application of 80 Ton Gantry Crane in Concrete Precast Beams

80 Ton-portaalkraan voor betonnen geprefabriceerde balken

De 80 ton gantry crane runs through the whole process of concrete precast beam production, storage, transportation and on-site installation, and its application effect directly affects the progress and quality of the whole project. It is widely used in various links of concrete precast beam construction, and its specific application scenarios are as follows:

1. 80 Ton Gantry Crane For Precast Beam Production Stage

In the precast beam production workshop, de 80 ton gantry crane undertakes the hoisting and positioning of key materials and components. Ten eerste, in the formwork installation link, it hoists the prefabricated steel formwork to the designated pouring position accurately, and adjusts the level and position through the high-precision positioning device to ensure the formwork is installed in place, laying a foundation for the forming quality of precast beams. Secondly, in the steel cage hoisting link, the 80-ton load-bearing capacity ensures that even large-scale steel cages (weighing tens of tons) can be hoisted stably, and the anti-sway device avoids the steel cage from colliding with the formwork during hoisting, ensuring the accuracy of steel cage positioning. Eindelijk, after the concrete pouring is completed and the initial setting is achieved, de 80 ton gantry crane is used to hoist and remove the formwork, which is efficient and safe, and avoids damage to the surface of the precast beam caused by manual formwork removal.

2. 80 Ton Gantry Crane For Precast Beam Curing and Storage Stage

After the concrete precast beams are poured and formed, they need to be transferred to the curing area for professional curing to ensure their strength and durability. De 80 ton gantry crane hoists the formed precast beams (with a weight of 50-80 ton) to the curing area smoothly, and places them neatly according to the specifications, avoiding collision between beams. After the curing is completed, the crane transfers the qualified precast beams to the storage yard for classified storage, and can stack them in layers according to the bearing capacity of the beams, saving the storage space. During the whole process, the stable operation and precise control of the crane effectively protect the integrity of the precast beams and avoid quality defects such as cracks.

3. 80 Ton Gantry Crane For Precast Beam Transportation Loading Stage

When the concrete precast beams need to be transported from the precast yard to the on-site construction site, de 80 ton gantry crane is responsible for loading the precast beams onto the special transport vehicle. Due to the large weight and volume of the precast beams, the crane needs to coordinate with the transport vehicle to realize precise positioning and stable hoisting. The frequency conversion control system of the crane can adjust the lifting speed according to the actual situation, ensuring that the precast beams are placed stably on the transport vehicle without tilting or sliding, and ensuring the safety of the transportation process.

4. 80 Ton Gantry Crane For Precast Beam On-site Installation Stage

On the bridge construction site, the installation of concrete precast beams is the core link, and the 80 ton gantry crane plays an irreplaceable role. According to the on-site construction environment, the crane is installed and debugged, and the gantry frame spans the bridge piers to realize the hoisting and installation of precast beams. The high-precision positioning device of the crane can accurately place the precast beams on the bridge piers, ensuring the installation accuracy and structural stability of the beams. Even in outdoor environments with wind or uneven ground, the crane can maintain stable operation through the wind speed monitoring device and stable structural design, ensuring the smooth progress of the precast beam installation work.

80 Ton-portaalkraan voor betonnen geprefabriceerde balken

In summary, de 80 ton portaalkraan, with its excellent product performance, standardized technical parameters and comprehensive application scenarios, has become an indispensable core equipment in the concrete precast beam industry. It not only improves the construction efficiency of concrete precast beams, reduces the labor intensity of operators, but also ensures the construction quality and operation safety, and promotes the high-quality development of infrastructure construction projects. With the continuous upgrading of equipment technology, de 80 ton gantry crane will be more intelligent and efficient, bringing more value to the concrete precast beam construction industry.

WEIHUA

WEIHUA-groep

Vorige artikel:
Volgende artikel:

Get Solution & Price Right Now!

Wij waarderen uw feedback! Vul het onderstaande formulier in, zodat we onze services kunnen aanpassen aan uw specifieke behoeften.

Naam:
* E -mail:
Whatsapp / Telefoonnummer:
Projectlocatie:
* Bericht:

Laatste opmerkingen

Joseph Ainoo zei:
Ik heb het elektrische schakelschema nodig van de 3tons bovenloopkraan (weihua) Nee. 2000266711
byeong ho yo zei:
Goedemiddag, Beste, Ik zou u graag een offerte willen vragen voor het onderstaande, 1. Zwaar uitgevoerd stalen wiel 2. Maat: 300mm OD x 80mm thickness x 50mm shaft hole 3.Material: zacht staal 4. Benodigde hoeveelheid: 192ea This requestions is for the investment plan. Please me know your estimate price Regards B.H.YOO
Anna Vlasnita zei:
Goedemiddag! Mijn naam is Anna, en ik vertegenwoordig het Roemeense bedrijf. Wij zijn op zoek naar bovenloopkranen met de volgende specificaties: 2.5T. Overspanningslengte 50m, spanwijdte 18m - 4 eenheden. 8T. Overspanningslengte 60m, spanwijdte 18m - 3 eenheden. 25T. Overspanningslengte 50m, spanwijdte 18m - 1 eenheid. Alle kranen moeten een afstandsbediening hebben. Kunt u uw prijzen doorgeven aan mijn e-mail??
Sadoh Gani zei:
Sluiting, Bouttype, Boog, G-2130 8,5T, Hot Dipped Galvanized 25Pcs Air Winch, Capacity-22000 LBS/10 TON 1Pcs Traveling Crane Hook Block Assembly ; Load Capacity-30 TON 1Pcs 6x19-IWRC, Diameter-7/8 inch/ 22 MM, Gegalvaniseerd, 1770MPa, MBL305KN, Length 250M/Reel 1Reel Wire Rope Clip,7/8Duim, 22mm, Hot dipped galvanized 10Pcs Grommet Sling, Diameter 1 1/4 Duim, 32 MM, 6 x37-FC, Gegalvaniseerd, Lengte: 6 Ft per pcs 20Pcs 8 Strand van polypropyleen meertouw, Diameter 80 mm, Lengte 220m/rol, Totaal 10 spoelen
enorme diensten Said:
50t swl crane hook swivel and rotating attachement

Gerelateerde gevallen

Whatsapp

Neem contact met ons op

Klik op de knop om productinformatie en offertes op WhatsApp te krijgen.

Krijg citaat
Whatsapp
Navraag