This guide specifies the standard installation procedures, 안전 요구 사항, and commissioning steps for double girder gantry cranes. It applies to industrial outdoor and indoor double girder gantry cranes used for material handling in factories, 포트, 건설 현장. All installation work must be performed by certified professional technicians in strict accordance with manufacturer specifications and national crane safety standards. Unauthorized modification of installation procedures is prohibited to avoid equipment failure, 구조적 손상, or safety accidents.

Double girder gantry crane installation guide

Double girder gantry crane installation guide

설치 전 준비

1. 현장점검 & Foundation Verification

첫 번째, inspect the installation site to ensure the ground foundation meets the load-bearing requirements of the double girder gantry crane. Check the flatness, 경도, and levelness of the foundation, and confirm there is no subsidence, 금이 가다, or uneven settlement. Verify the installation spacing, track center distance, and overall dimension of the site match the crane’s design parameters. Clean up obstacles on the installation route and working area to ensure sufficient space for hoisting, 집회, and subsequent operation.

2. 레일 설치 & 점검

Install the crane running rails strictly according to the design drawings. Fix the rails on the foundation embedded parts, adjust the rail levelness, 직진성, and gauge deviation to meet standard requirements. 설치 후, conduct a comprehensive inspection: check rail connection firmness, weld quality, and end clearance; ensure no deformation or dislocation of the rails. Record all inspection data for subsequent acceptance reference.

3. Component Checking & Tool Preparation

Unpack all crane components including double main girders, 지지 다리, 끝 마차, traveling wheels, hoist trolley, 전기 제어 시스템, 패스너, and safety accessories. Carefully check each part for manufacturing defects, 흉한 모습, 녹, 또는 손상, and verify the quantity and model of components are consistent with the delivery list. Prepare professional installation tools, hoisting equipment (auxiliary cranes, 슬링, 족쇄), measuring instruments (laser level, 토크 렌치, 줄자), and safety protection supplies.

4. 안전 준비

Set up warning zones and safety barriers around the installation site, and post safety warning signs. All construction personnel must wear safety helmets, safety belts, and other protective equipment. Conduct pre-installation safety technical disclosure to clarify operation specifications, risk points, and emergency disposal measures. Confirm the power supply of the site is stable and grounded reliably to ensure safe electrical operation.

Double girder gantry crane installation guide

Double girder gantry crane installation guide

Main Mechanical Structure Installation

1. Ground Pre-Assembly

Complete partial pre-assembly of components on the flat ground to reduce high-altitude operation risks. Assemble the two main girders as a whole structure according to the assembly marks, fasten all connecting bolts with a torque wrench to reach the specified torque value. Install the walking platform, 난간, and trolley running track on the main girders, and check the flatness and firmness of the track surface. Then assemble the supporting legs and end carriages into integrated parts respectively.

2. Supporting Leg & End Carriage Installation

Use qualified auxiliary hoisting equipment to lift the assembled supporting leg and end carriage assemblies vertically, and place them accurately on the reserved installation position of the running rails. Adjust the verticality, 평탄함, and spacing of the supporting legs strictly, fix the traveling wheel boxes on the rails, and ensure the wheels are completely attached to the rail surface without deviation or suspension. Temporarily fix all connecting parts to prevent displacement during subsequent girder installation.

3. Double Main Girder Hoisting & Fixing

Adopt integral hoisting method for the assembled double main girders. Hang the slings at the designated lifting points of the girders to ensure uniform stress and balance during hoisting, and avoid tilting or structural deformation. Slowly lift the main girder assembly to the design height, align the connecting holes with the top of the supporting legs accurately, and carry out butt joint installation. After precise alignment, install and tighten all high-strength bolts in sequence, and use a laser level to recheck the levelness and span deviation of the main girders to ensure compliance with design standards.

4. 트롤리 & Hoisting Mechanism Installation

Place the assembled hoist trolley stably on the trolley track of the double main girders, adjust the trolley wheel gap and running parallelism to ensure flexible and jitter-free movement. Install the lifting mechanism, steel wire rope, 풀리 블록, and hook group in strict accordance with the mechanical assembly drawings. Check the winding direction and tightness of the steel wire rope to ensure no strand disorder, extrusion, 또는 착용. Install buffer devices, limit stoppers, and anti-derailment devices at both ends of the trolley track.

Double girder gantry crane installation guide

Double girder gantry crane installation guide

Electrical System Installation

1. Electrical Component Installation

Install the main electrical control cabinet, trolley control box, resistance box, and operating device (pendant control or cab control) at the designated positions. Fix all electrical boxes firmly with shock absorption measures to prevent vibration damage during crane operation. Install travel limit switches, lifting height limit switches, 과부하 리미터, and other safety electrical accessories, and ensure all sensor components are installed accurately and fixed reliably.

2. 배선 & Grounding

Lay cables strictly in accordance with the electrical wiring diagram, arrange cables neatly, and fix them with cable clamps to avoid dragging, extrusion, and friction damage. Connect L1, L2, L3 power lines, neutral line N, and protection grounding line PE correctly, and tighten all copper wire terminals firmly to ensure good electrical contact. Complete the grounding connection of the crane metal structure, and test the grounding resistance to ensure it meets safety standards, preventing electric leakage accidents.

3. Circuit Inspection

After wiring completion, conduct a comprehensive circuit inspection. Check for wrong wiring, missing connection, virtual connection, and short circuit risks. Verify the phase sequence of the power supply to ensure the walking and lifting directions of the crane are consistent with the control operation. Inspect the insulation performance of all circuits to ensure no insulation damage or electric leakage hidden dangers.

Double girder gantry crane installation guide

Double girder gantry crane installation guide

Debugging & 시운전

1. No-Load Debugging

Switch on the power after confirming all mechanical and electrical installations are qualified. Conduct no-load operation debugging: operate the crane’s longitudinal traveling, trolley transverse traveling, and lifting mechanism respectively. Check whether each mechanism runs smoothly without abnormal noise, jitter, or stuck phenomenon. Test the sensitivity and reliability of all limit switches, 완충 장치, and safety protection functions, and adjust the limit stroke to the standard range.

2. 부하 테스트 & 구경 측정

After qualified no-load debugging, carry out graded load tests according to standard procedures, 포함 25%, 50%, 75%, 100%, 그리고 125% rated load tests. During the test, check the structural deformation of the main girders and supporting legs, the operating stability of each transmission mechanism, the braking performance of the brake system, and the accuracy of the overload protection device. Record all test data, and adjust and calibrate unqualified items until they meet the standard requirements.

3. Overall Performance Inspection

Inspect the overall operation coordination of the crane, confirm the synchronous operation of each mechanism, accurate control response, and reliable braking. Check the tightness of all connecting bolts, the lubrication state of transmission parts, and the integrity of safety accessories. Eliminate all installation defects and hidden troubles to ensure the crane’s overall performance meets design and safety operation standards.

Final Acceptance & Safety Notes

1. Completion Acceptance

Sort out all installation records, inspection data, 테스트 보고서, and component qualification certificates to form a complete acceptance document. Conduct final acceptance jointly by the construction team, supervision party, and user party. The crane can only be put into formal operation after passing the overall acceptance and obtaining the crane use qualification certificate.

2. Daily Safety Operation Notes

Operators must receive professional training and hold valid certificates before taking up their posts. Strictly abide by the crane operating specifications, prohibit overload operation, oblique pulling, and random limit operation. Conduct daily inspection and regular maintenance of the crane’s mechanical structure, 전기 시스템, and safety devices to ensure long-term stable and safe operation of the equipment.

3. Post-Installation Maintenance

After installation and commissioning, lubricate all rotating and transmission parts comprehensively. Check and fasten all loose fasteners again. Clean the equipment surface, sort out installation tools and residual materials on site, and complete site cleaning and finishing work.

Double girder gantry crane installation guide

웨이화공장

이전 기사:
더 이상, 이미 최신 기사입니다

Get Solution & Price Right Now!

우리는 귀하의 의견을 소중히 여깁니다! 귀하의 특정 요구에 맞게 서비스를 조정할 수 있도록 아래 양식을 작성하십시오..

이름:
* 이메일:
whatsapp / 전화 번호:
프로젝트 위치:
* 메시지:

최신 의견

테스페이 멜레세는 말했다.:
40 전체 전기 및 기계 액세서리가 포함된 톤 더블 대들보 오버헤드 크레인 트롤리 어셈블리
리카르도 아길라르는 말했다.:
크레인 재조정 프로젝트의 경우, 귀하의 웹사이트에 에어컨 장치를 설치해야 하는데 이 솔루션을 찾았습니다.. 냉각능력: 2.5 KW 7.0 KW (8,500 에이 24,000 BTU/시간) 난방능력 (선택 과목): 2.0 KW 6.0 KW Fuente de alimentación: 24DC에서 / 110V y / 230V y / 415V y, 50/60 HZ (요구사항 지정) 냉장고: R410A 또는 생태학적 R134a
말했다:
용량 50 TON AKS ARALIK 40 미터 12 METRE KANCA ALTI RAY BOYU 250 미터, 2 수량 포털 크레인
휴버트 파티노가 말했다.:
친애하는 Weihua 크레인, GPANTEC SAC를 대표하여 인사드립니다., 리마에 위치, 페루. 귀사에서 제작한 12톤 스내치 블록 견적을 요청하고 싶습니다.. 오버헤드 크레인의 제품 참조 코드 또는 일련번호는 다음과 같습니다. 110220.075, 스내치 블록 모델은 12/2t-40M입니다.. 우리가 요청한 스내치 블록의 이미지가 첨부되어 있습니다. 요청 수량은 1개 키트입니다.. 여러분의 따뜻한 관심을 기대합니다. 감사합니다.
라 그레인지 사이드:
친애하는 선생님이나 부인, 우리는 현재 모노레일 트랙에서 작동하는 전기 체인 호이스트용 밀폐형 도체 레일 시스템 공급업체를 찾고 있습니다.. 다음 요구사항에 대한 견적을 제공해 주세요.: Project Scope Quantity: 8 independent lines Length: 80 meters per line Total length: 640 meters Electrical Requirements Supply voltage: 400 VAC Frequency: 50 Hz Number of poles: 4 정격전류: 최저한의 40 A Application Electric chain hoist Safe Working Load (SWL): 2,500 kg One hoist per line Outdoor industrial installation Protection Requirements Minimum protection class: IP43 Preferred protection class: IP54 or higher Please include in your offer Conductor rails Power feed sections Joint assemblies End caps Hangers and support brackets Current collectors Expansion sections if required Complete accessory list Documentation Required Technical datasheets. 전체 시스템의 IP 보호 등급에 대한 서면 확인서. IP43/IP54 요구 사항 준수를 입증하는 테스트 인증서 또는 실험실 보고서. 유사한 크레인 설치 참고자료, 모노레일, 또는 응용 프로그램을 호이스트. 표시도 해주세요: 배달 시간. 제조국. 보증 기간. 인코텀즈. 라인당 및 전체 프로젝트에 대한 가격 분석. 미리 감사드립니다, 세드릭 헛간

관련 사례

whatsapp

저희에게 연락하십시오

WhatsApp에서 제품 정보 및 따옴표를 얻으려면 버튼을 클릭하십시오..

견적을 얻으십시오
whatsapp
문의