» 블로그 » 80 콘크리트 프리캐스트 빔용 톤 갠트리 크레인

80 콘크리트 프리캐스트 빔용 톤 갠트리 크레인

2026-01-26

80 콘크리트 프리캐스트 빔용 톤 갠트리 크레인

그만큼 80 ton gantry crane is a professional heavy-duty lifting equipment specially designed and manufactured for the hoisting, transferring, stacking and installation of concrete precast beams in infrastructure projects such as highway bridges, railway bridges, urban overpasses and large-scale industrial plants. As a core lifting tool in the concrete precast beam industry, it integrates reliability, efficiency and precision, and effectively solves the pain points of heavy weight, large volume, high precision requirements and complex operation scenarios of precast beams, providing strong support for improving construction efficiency, ensuring project quality and reducing operation risks.

Product Features of 80 톤 갠트리 크레인

80 콘크리트 프리캐스트 빔용 톤 갠트리 크레인

그만큼 80 ton gantry crane has obvious advantages over ordinary lifting equipment, which is closely related to its scientific structural design and humanized functional configuration, and its features are perfectly adapted to the application needs of concrete precast beams:

Technical Parameters of 80 톤 갠트리 크레인

매개변수 이름
사양
Rated Lifting Weight
80 톤
기간
18-30중 (사용자 정의 가능)
리프팅 높이
8-16중 (사용자 정의 가능)
리프팅 속도
0.5-5m/나 (frequency conversion stepless speed regulation)
이동 속도
5-20m/나 (frequency conversion stepless speed regulation)
전원 공급 장치
380다섯, 50HZ, 3-단계 (customizable according to regional standards)
제어 모드
Ground control + 원격 제어 (dual control, 선택 과목)
Steel Structure Material
Q355B high-strength steel
노동 계급
A5-A6 (suitable for heavy-duty continuous operation)
전체 중량
120-180 톤 (depending on span and lifting height)

Application of 80 Ton Gantry Crane in Concrete Precast Beams

80 콘크리트 프리캐스트 빔용 톤 갠트리 크레인

그만큼 80 ton gantry crane runs through the whole process of concrete precast beam production, 저장, transportation and on-site installation, and its application effect directly affects the progress and quality of the whole project. It is widely used in various links of concrete precast beam construction, and its specific application scenarios are as follows:

1. 80 Ton Gantry Crane For Precast Beam Production Stage

In the precast beam production workshop, 그만큼 80 ton gantry crane undertakes the hoisting and positioning of key materials and components. 첫째로, in the formwork installation link, it hoists the prefabricated steel formwork to the designated pouring position accurately, and adjusts the level and position through the high-precision positioning device to ensure the formwork is installed in place, laying a foundation for the forming quality of precast beams. 둘째, in the steel cage hoisting link, the 80-ton load-bearing capacity ensures that even large-scale steel cages (weighing tens of tons) can be hoisted stably, and the anti-sway device avoids the steel cage from colliding with the formwork during hoisting, ensuring the accuracy of steel cage positioning. 마지막으로, after the concrete pouring is completed and the initial setting is achieved, 그만큼 80 ton gantry crane is used to hoist and remove the formwork, which is efficient and safe, and avoids damage to the surface of the precast beam caused by manual formwork removal.

2. 80 Ton Gantry Crane For Precast Beam Curing and Storage Stage

After the concrete precast beams are poured and formed, they need to be transferred to the curing area for professional curing to ensure their strength and durability. 그만큼 80 ton gantry crane hoists the formed precast beams (with a weight of 50-80 톤) to the curing area smoothly, and places them neatly according to the specifications, avoiding collision between beams. After the curing is completed, the crane transfers the qualified precast beams to the storage yard for classified storage, and can stack them in layers according to the bearing capacity of the beams, saving the storage space. During the whole process, the stable operation and precise control of the crane effectively protect the integrity of the precast beams and avoid quality defects such as cracks.

3. 80 Ton Gantry Crane For Precast Beam Transportation Loading Stage

When the concrete precast beams need to be transported from the precast yard to the on-site construction site, 그만큼 80 ton gantry crane is responsible for loading the precast beams onto the special transport vehicle. Due to the large weight and volume of the precast beams, the crane needs to coordinate with the transport vehicle to realize precise positioning and stable hoisting. The frequency conversion control system of the crane can adjust the lifting speed according to the actual situation, ensuring that the precast beams are placed stably on the transport vehicle without tilting or sliding, and ensuring the safety of the transportation process.

4. 80 Ton Gantry Crane For Precast Beam On-site Installation Stage

On the bridge construction site, the installation of concrete precast beams is the core link, and the 80 ton gantry crane plays an irreplaceable role. According to the on-site construction environment, the crane is installed and debugged, and the gantry frame spans the bridge piers to realize the hoisting and installation of precast beams. The high-precision positioning device of the crane can accurately place the precast beams on the bridge piers, ensuring the installation accuracy and structural stability of the beams. Even in outdoor environments with wind or uneven ground, the crane can maintain stable operation through the wind speed monitoring device and stable structural design, ensuring the smooth progress of the precast beam installation work.

80 콘크리트 프리캐스트 빔용 톤 갠트리 크레인

In summary, 그만큼 80 톤 갠트리 크레인, with its excellent product performance, standardized technical parameters and comprehensive application scenarios, has become an indispensable core equipment in the concrete precast beam industry. It not only improves the construction efficiency of concrete precast beams, reduces the labor intensity of operators, but also ensures the construction quality and operation safety, and promotes the high-quality development of infrastructure construction projects. With the continuous upgrading of equipment technology, 그만큼 80 ton gantry crane will be more intelligent and efficient, bringing more value to the concrete precast beam construction industry.

와이하

웨이화그룹

이전 기사:
다음 기사:

Get Solution & Price Right Now!

우리는 귀하의 의견을 소중히 여깁니다! 귀하의 특정 요구에 맞게 서비스를 조정할 수 있도록 아래 양식을 작성하십시오..

이름:
* 이메일:
whatsapp / 전화 번호:
프로젝트 위치:
* 메시지:

최신 의견

조셉 아이누는 말했다.:
3톤 오버헤드 크레인의 전기 회로도가 필요합니다. (웨이화) 아니요. 2000266711
유병호가 말했다.:
좋은 오후에요, ~에게, 아래와 같이 견적을 요청하고 싶습니다., 1. 헤비듀티 스틸 휠 2. 크기: 300mm OD x 80mm thickness x 50mm shaft hole 3.Material: 연강 4. 필요 수량: 192ea This requestions is for the investment plan. Please me know your estimate price Regards B.H.YOO
안나 블라스니타가 말했다.:
좋은 오후에요! 내 이름은 안나예요, 저는 루마니아 회사를 대표합니다. 우리는 다음 사양의 오버헤드 크레인을 구매하려고 합니다.: 2.5티. 경간 길이 50m, 경간 폭 18m - 4 단위. 8티. 경간 길이 60m, 경간 폭 18m - 3 단위. 25티. 경간 길이 50m, 경간 폭 18m - 1 단위. 모든 크레인에는 리모콘이 있어야 합니다.. 내 이메일로 가격을 알려주실 수 있나요??
사도 가니가 말했다.:
걸쇠, 볼트 유형, 절하다, G-2130 8.5T, Hot Dipped Galvanized 25Pcs Air Winch, Capacity-22000 LBS/10 TON 1Pcs Traveling Crane Hook Block Assembly ; Load Capacity-30 TON 1Pcs 6x19-IWRC, 직경-7/8인치/ 22 MM, 아연 도금, 1770MPa, MBL 305KN, Length 250M/Reel 1Reel Wire Rope Clip,7/8인치, 22mm, Hot dipped galvanized 10Pcs Grommet Sling, 지름 1 1/4 인치, 32 MM, 6 x37-FC, 아연 도금, 길이: 6 Ft per pcs 20Pcs 8 물가 폴리프로필렌 계류용 밧줄, 직경 80mm, 길이 220m/코일, 총 10코일
거대한 서비스 말했다:
50t swl crane hook swivel and rotating attachement

관련 사례

whatsapp

저희에게 연락하십시오

WhatsApp에서 제품 정보 및 따옴표를 얻으려면 버튼을 클릭하십시오..

견적을 얻으십시오
whatsapp
문의