Overhead crane inspection is one of the most critical practices for workplace safety, 監管合規性, and equipment longevity. Whether you run a manufacturing plant, 倉庫, construction site, or logistics center, knowing the correct inspection schedule protects your team, reduces downtime, and avoids costly violations. In this post, we break down how often overhead cranes should be inspected based on industry standards and best practices.

Why Overhead Crane Inspection Is Non-Negotiable

橋式起重機 handle heavy loads in demanding environments. 穿, 疲勞, 腐蝕, and mechanical failure can develop slowly but lead to serious accidents. Regular overhead crane inspection:

No matter how new or reliable your crane seems, skipping inspections creates unnecessary risk.

overhead crane inspection

Standard Overhead Crane Inspection Frequencies

Industry guidelines (OSHA, ASME B30.2, CMAA) divide overhead crane inspection into two main categories: frequent inspections and periodic inspections.

1. 頻繁檢查 (Daily to Monthly)

These are visual and functional checks performed by operators or trained maintenance staff.

2. 定期檢查 (1–12 Months)

These are comprehensive inspections performed by a qualified person or certified technician. Frequency depends on usage severity:

All cranes require at least one full periodic inspection per year.

overhead crane inspection

When to Inspect Immediately (Outside the Schedule)

You must perform an immediate overhead crane inspection if:

Never operate a crane that fails any inspection step.

Key Items Covered in Overhead Crane Inspection

A complete inspection covers the entire system:

Documentation is mandatory for compliance.

overhead crane inspection

How to Build a Compliant Inspection Plan

overhead crane inspection

最後的想法

How often should overhead cranes be inspected? The short answer: daily by operators, monthly in detail, and at least annually by a qualified inspector — with more frequent checks for heavy-use equipment.

Overhead crane inspection is not just a regulatory box to check; it is a foundational safety practice. A consistent, well-documented inspection program keeps your operation safe, 高效的, and reliable.

上一篇文章:
下一篇文章:

Get Solution & Price Right Now!

我們重視您的反饋! 請填寫下面的表格,以便我們可以根據您的特定需求來量身定制服務.

姓名:
* 電子郵件:
WhatsApp / 電話號碼:
項目位置:
* 訊息:

最新評論

薩多·加尼·賽義德:
卸扣, 螺栓類型, 弓, G-2130 8.5T, Hot Dipped Galvanized 25Pcs Air Winch, Capacity-22000 LBS/10 TON 1Pcs Traveling Crane Hook Block Assembly ; Load Capacity-30 TON 1Pcs 6x19-IWRC, 直徑-7/8 英吋/ 22 毫米, 鍍鋅, 1770百萬帕, MBL 305KN, Length 250M/Reel 1Reel Wire Rope Clip,7/8英吋, 22毫米, Hot dipped galvanized 10Pcs Grommet Sling, 直徑 1 1/4 英吋, 32 毫米, 6 x37-FC, 鍍鋅, 長度: 6 Ft per pcs 20Pcs 8 聚丙烯絞合繩, 直徑80毫米, 長度220m/卷, 共 10 個線圈
大型服務說:
50t swl crane hook swivel and rotating attachement
DM 什里瓦斯塔夫·賽義德:
你好, 我們正在尋找柄型鉤 - 30噸容量符合 ASME 標準 30.10 性病. Please share your Best Quotation for the HOOK and GA for HOOK Thanks & 看待.

相關案例

WhatsApp

聯繫我們

單擊按鈕以獲取產品信息和引號.

獲取報價
WhatsApp
詢問
× 衛華起重機將參展CONEXPO-CON/AGG 2026