overhead crane inspection

Overhead crane inspection is one of the most critical practices for workplace safety, відповідність нормативним вимогам, and equipment longevity. Whether you run a manufacturing plant, склад, construction site, or logistics center, knowing the correct inspection schedule protects your team, reduces downtime, and avoids costly violations. У цій публікації, we break down how often overhead cranes should be inspected based on industry standards and best practices.

Why Overhead Crane Inspection Is Non-Negotiable

Мостові крани handle heavy loads in demanding environments. Носити, втома, корозія, and mechanical failure can develop slowly but lead to serious accidents. Regular overhead crane inspection:

No matter how new or reliable your crane seems, skipping inspections creates unnecessary risk.

overhead crane inspection

Standard Overhead Crane Inspection Frequencies

Industry guidelines (OSHA, ASME B30.2, CMAA) divide overhead crane inspection into two main categories: frequent inspections and periodic inspections.

1. Frequent Inspections (Daily to Monthly)

These are visual and functional checks performed by operators or trained maintenance staff.

2. Periodic Inspections (1–12 Months)

These are comprehensive inspections performed by a qualified person or certified technician. Frequency depends on usage severity:

All cranes require at least one full periodic inspection per year.

overhead crane inspection

When to Inspect Immediately (Outside the Schedule)

You must perform an immediate overhead crane inspection if:

Never operate a crane that fails any inspection step.

Key Items Covered in Overhead Crane Inspection

A complete inspection covers the entire system:

Documentation is mandatory for compliance.

overhead crane inspection

How to Build a Compliant Inspection Plan

overhead crane inspection

Заключні думки

How often should overhead cranes be inspected? The short answer: daily by operators, monthly in detail, and at least annually by a qualified inspector — with more frequent checks for heavy-use equipment.

Overhead crane inspection is not just a regulatory box to check; it is a foundational safety practice. A consistent, well-documented inspection program keeps your operation safe, ефективний, and reliable.

Попередня стаття:
Наступна стаття:

Get Solution & Price Right Now!

Ми цінуємо ваш відгук! Будь ласка, заповніть форму нижче, щоб ми могли налаштувати наші послуги до ваших конкретних потреб.

Назва:
* Електронна пошта:
WhatsApp / Номер телефону:
Розташування проекту:
* Повідомлення:

Останні коментарі

Садох Гані Саїд:
кайдани, Тип болта, Лук, G-2130 8.5T, Hot Dipped Galvanized 25Pcs Air Winch, Capacity-22000 LBS/10 TON 1Pcs Traveling Crane Hook Block Assembly ; Load Capacity-30 TON 1Pcs 6x19-IWRC, Діаметр-7/8 дюймів/ 22 ММ, Оцинкований, 1770МПа, MBL 305 кун, Length 250M/Reel 1Reel Wire Rope Clip,7/8дюйм, 22мм, Hot dipped galvanized 10Pcs Grommet Sling, Діаметр 1 1/4 дюйм, 32 ММ, 6 x37-FC, Оцинкований, Довжина: 6 Ft per pcs 20Pcs 8 Поліпропіленовий швартовий трос, Діаметр 80 мм, Довжина 220м/котушку, Всього 10 котушок
енорм-послуги Саїд:
50t swl crane hook swivel and rotating attachement
Д М Шривастав Саїд:
привіт, Шукаємо ГАЧОК ТИПУ ХВОЛОВОК - 30Вантажопідйомність відповідно до ASME 30.10 STD. Please share your Best Quotation for the HOOK and GA for HOOK Thanks & З повагою.

Пов'язані випадки

WhatsApp

Зв’яжіться з нами

Натисніть кнопку, щоб отримати інформацію та цитати продукту на WhatsApp.

Отримайте цитату
WhatsApp
Розслідування
× Weihua Crane буде виставлятися на CONEXPO-CON/AGG 2026