Our Overhead Crane for Foundry is a heavy-duty solution with high-temp resistance (up to 600°C), 5-200t load capacity, dust/corrosion protection & safety compliance. Boost foundry productivity safely.
Dökümhane operasyonları sağlamlık gerektirir, reliable lifting equipment that can withstand extreme conditions—high temperatures, heavy loads, abrasive dust, and corrosive materials. Our overhead crane for foundry is engineered specifically to meet these challenges, delivering safe, verimli, and consistent performance for casting processes, from raw material handling to finished product transport. As a specialized heavy-duty lifting solution, it integrates advanced technology and durable components to optimize productivity while minimizing downtime in foundry environments.


|
Parametre
|
Spesifikasyon Aralığı
|
|
Yük kapasitesi
|
5t – 200t
|
|
Aralık uzunluğu
|
10m – 35m
|
|
Kaldırma yüksekliği
|
8m – 30m
|
|
Çalışma sıcaklığı
|
-20°C – 600°C
|
|
Kaldırma hızı
|
0.5m/dak – 10m/dak (adjustable via VFD)
|
|
Seyahat Hızı
|
10m/min – 40m/min
|
|
Kontrol modu
|
Sarkıt kontrolü, uzaktan kumanda, veya kabin kontrolü
|
|
Güç kaynağı
|
380V/400V, 3-phase, 50/60Hz (özelleştirilebilir)
|
|
Koruma Sınıfı
|
IP54 – IP65 (electrical components)
|

1. Adaptability to Foundry-Specific Challenges
Foundries face unique harsh conditions, and our overhead crane is designed to thrive in them. The heat-resistant structure prevents component deformation under high temperatures, while dust-proof design avoids mechanical jamming from foundry sand and metal particles. It handles corrosive substances like molten slag and chemical additives without performance degradation.
2. Geliştirilmiş verimlilik & Yeterlik
The crane’s high load capacity and fast, precise operation streamline critical foundry processes. It accelerates raw material (scrap metal, alloys) feeding into furnaces, enables smooth molten metal transfer to molds, and simplifies finished casting handling. Reduced lifting cycle times and minimal downtime boost overall production throughput.
3. Improved Safety for Personnel & Teçhizat
Safety is paramount in foundries, and our gezer vinç integrates multiple protective features. Overload protection prevents structural damage, anti-sway technology avoids molten metal spills, and emergency stop functions ensure immediate shutdown in emergencies. This reduces accident risks and protects workers, teçhizat, and valuable castings.
4. Uygun Maliyetli & Düşük Bakım
Durable materials and sealed components minimize wear and tear, reducing maintenance frequency and costs. The energy-efficient VFD system lowers power consumption, while the crane’s long service life delivers a high return on investment. Customizable configurations also allow alignment with specific foundry layouts and production needs, avoiding unnecessary expenses.

Çeyrek: Can the overhead crane for foundry handle molten metal directly?
A1: Evet, it is designed with heat-resistant materials and thermal insulation, enabling safe direct handling of molten metal (Örn., çelik, alüminyum) in temperatures up to 600°C.
Çubuk: How often does the foundry overhead crane require maintenance?
A2: Routine inspection is recommended monthly, with comprehensive maintenance every 6–12 months—adjustable based on usage frequency and harshness of the foundry environment.
Çeyrek: Can the crane be customized to fit my foundry’s specific span or height?
A3: Kesinlikle. We offer fully customizable span lengths (10m–35m), lifting heights (8m–30m), and load capacities (5t–200t) to match your facility’s layout and production needs.
Çeyrek: Does the crane comply with international safety standards for foundries?
A4: Evet, it meets global standards including ISO, CE, ve OSHA, with built-in safety features to ensure compliance in hazardous foundry operations.
Q5: What control options are available for the foundry overhead crane?
A5: You can choose pendant control (for short-distance operation), uzaktan kumanda (for flexibility), veya kabin kontrolü (for precise long-term operation), based on your workflow.
S6: Kurulum ne kadar sürer, and will it disrupt my foundry’s production?
A6: Installation typically takes 1–2 weeks, and we offer off-peak scheduling and modular assembly to minimize production downtime.
PDF ile paylaş: İndirmek


Geri bildiriminize değer veriyoruz! Hizmetlerimizi özel ihtiyaçlarınıza göre uyarlayabilmemiz için lütfen aşağıdaki formu doldurun.
Kaldırma yüksekliği sınırlayıcı, kancanın aşırı kaldırma riskini etkili bir şekilde azaltır, hangi……
Daha Fazla Keşfedin →
Giriş 3 Tons Overhead Crane A 3 tonluk gezer vinç çok yönlü bir vinçtir, industri……
Daha Fazla Keşfedin →
. 7 tonluk gezer vinç çok yönlü ve vazgeçilmez bir malzeme taşıma ekipmanıdır ……
Daha Fazla Keşfedin →
Son Yorumlar