A single girder overhead crane is a versatile material handling equipment designed for lifting and moving loads in industrial settings.

A single girder overhead crane is a versatile material handling equipment designed for lifting and moving loads in industrial settings. Composed of a single main beam (girder) supported by end carriages, a trolley, and a hoist, this crane operates on elevated runways, maximizing floor space utilization. Ideal for light to medium-duty applications, it balances cost-effectiveness, compact design, and reliable performance—making it a go-to choice for factories, คลังสินค้า, and workshops seeking efficient load management.

Our single girder overhead cranes are engineered to meet rigorous industrial demands, with features that set them apart:

|
พารามิเตอร์
|
Range/Details
|
|
ความสามารถในการยก
|
0.5 - 32 ตัน (customizable for higher capacities upon request)
|
|
ขยายความยาว
|
5 - 30 เมตร (adjustable based on facility dimensions)
|
|
ยกความสูง
|
3 - 30 เมตร (extendable with specialized configurations)
|
|
ชนชั้นแรงงาน
|
A3 – A5 (suitable for medium-duty, intermittent operations)
|
|
Hoist Speed
|
0.8 - 16 ม/ของฉัน (variable speed options available)
|
|
Trolley Travel Speed
|
10 - 30 ม/ของฉัน
|
|
Crane Travel Speed
|
20 - 45 ม/ของฉัน
|
|
แหล่งจ่ายไฟ
|
380V/3PH/50Hz (customizable for 220V, 440V, or other regional standards)
|
|
ระบบควบคุม
|
การควบคุมจี้, remote control (wireless optional), or PLC integration
|

Our single girder overhead cranes excel in diverse sectors, streamlining material handling across:
ไตรมาสที่ 1: What’s the difference between a single girder and double girder overhead crane?
A1: Single girder cranes use one main beam, are lighter, more affordable, and ideal for light to medium loads. Double girder overhead cranes have two beams, offering higher lifting capacities (32+ ตัน) and greater stability for heavy-duty applications.
ไตรมาสที่ 2: Can a single girder overhead crane be installed outdoors?
A2: Yes—we offer weatherproof models with corrosion-resistant coatings, sealed electrical components, and rain shields, suitable for outdoor yards or construction sites.
ไตรมาสที่ 3: How long does installation take?
A3: Installation typically takes 3–7 days, depending on the crane size, site preparation (เช่น, runway setup), and configuration complexity. Our team provides on-site support for seamless setup.
ไตรมาสที่ 4: What maintenance is required?
A4: Regular maintenance includes checking hoist cables for wear, lubricating trolley/overhead crane wheels, testing safety switches, and inspecting electrical connections. We recommend quarterly inspections for optimal performance.
คำถามที่ 5: Are your cranes compliant with international standards?
A5: Absolutely. All our single girder overhead cranes meet ISO 9001 quality standards, CE certification for EU markets, and OSHA guidelines for safety, ensuring global compatibility.
Share with PDF: ดาวน์โหลด


เราให้ความสำคัญกับความคิดเห็นของคุณ! กรุณากรอกแบบฟอร์มด้านล่างเพื่อให้เราสามารถปรับแต่งบริการของเราให้ตรงกับความต้องการเฉพาะของคุณ.
ดาวน์โหลดข้อมูล PDF ของเครนสะพาน WEIHUA: Download Designed with a single beam and electric……
ค้นพบเพิ่มเติม →
The core structure of the single girder eot crane consists of a bridge supported at both……
ค้นพบเพิ่มเติม →
ที่ 10 ton overhead crane is an indispensable heavy-duty material handling solution in ……
ค้นพบเพิ่มเติม →
ความคิดเห็นล่าสุด