Overhead crane inspection is one of the most critical practices for workplace safety, การปฏิบัติตามกฎระเบียบ, and equipment longevity. Whether you run a manufacturing plant, คลังสินค้า, construction site, or logistics center, knowing the correct inspection schedule protects your team, reduces downtime, and avoids costly violations. ในโพสต์นี้, we break down how often overhead cranes should be inspected based on industry standards and best practices.
เครนเหนือศีรษะ handle heavy loads in demanding environments. สวมใส่, ความเหนื่อยล้า, การกัดกร่อน, and mechanical failure can develop slowly but lead to serious accidents. Regular overhead crane inspection:
No matter how new or reliable your crane seems, skipping inspections creates unnecessary risk.

Industry guidelines (OSHA, ASME B30.2, ซีเอ็มเอเอ) divide overhead crane inspection into two main categories: frequent inspections and periodic inspections.
These are visual and functional checks performed by operators or trained maintenance staff.
These are comprehensive inspections performed by a qualified person or certified technician. Frequency depends on usage severity:
All cranes require at least one full periodic inspection per year.

You must perform an immediate overhead crane inspection if:
Never operate a crane that fails any inspection step.
A complete inspection covers the entire system:
Documentation is mandatory for compliance.


How often should overhead cranes be inspected? The short answer: daily by operators, monthly in detail, and at least annually by a qualified inspector — with more frequent checks for heavy-use equipment.
Overhead crane inspection is not just a regulatory box to check; it is a foundational safety practice. A consistent, well-documented inspection program keeps your operation safe, มีประสิทธิภาพ, and reliable.