Crane hooks are the vital, often singular, connection point between the lifting apparatus and the load. Ensuring their structural integrity and safe working load (Свл) capacity is non-negotiable for preventing catastrophic failures. Load testing is a mandatory procedure designed to verify this integrity beyond any doubt. Here’s a detailed look at the standard load testing procedure for crane hooks:
1. To verify the hook’s ability to safely lift its rated SWL and beyond, within defined safety margins.
2. To detect hidden flaws, пукотина, deformations, or material weaknesses not visible during routine inspections.
3. To ensure compliance with regulatory standards (like OSHA, АСМЕ Б30.10, ИСО 4309) and manufacturer specifications.
4. To provide documented proof of the hook’s fitness for service.
1. Пробник тест оптерећења (Static Test): The most common type, applying a static load greater than the SWL but less than the ultimate strength.
2. Dynamic Load Test: Involves lifting, lowering, and sometimes swinging a test load to simulate operational stresses. Often performed on the entire crane system, but hook performance is critical.
1. Pre-Test Preparations:
2. Applying the Load:
3. Post-Hold Actions:
4. Evaluation & Документација:
Pass Criteria: The hook passes if:
No cracks are detected during pre, during, or post-test inspections.
No permanent deformation exceeding allowable tolerances is measured.
The latch (if present) functions correctly.
Fail Criteria: The hook fails if:
Any crack is detected.
Permanent deformation exceeds specified limits.
The latch is damaged or malfunctions.
Any other defect compromising safety is found.
Tagging: If passed, attach a durable, weather-resistant test tag securely to the hook. It must clearly state:
Свл
Test Load Applied (Нпр., “Tested to 125% SWL”)
Test Date
Next Test Due Date (based on regulatory/company schedule)
Unique Identification (Серијски број)
Testing Authority/Company
Certificate of Test: Issue a formal test certificate detailing all aspects of the test (hook ID, Свл, test load, date, inspector, results, standards followed). This is a critical legal and safety document.
Load testing crane hooks is not merely a regulatory box-ticking exercise; it is a fundamental pillar of lifting safety. A meticulously executed load test procedure, performed by qualified individuals at the required intervals, provides the highest level of assurance that this critical component will perform reliably under stress. Consistent adherence to this procedure protects personnel, safeguards equipment, prevents costly downtime and damage, and ultimately saves lives. Never compromise on the integrity of the hook or the rigor of its testing.
Ценимо ваше повратне информације! Молимо испуните доњи образац како бисмо прилагодили наше услуге на ваше специфичне потребе.
Кликните на дугме да бисте добили информације и цитати производа на ВхатсАпп-у.
Набавити цитат
Најновији коментари