A single girder overhead crane is a versatile material handling equipment designed for lifting and moving loads in industrial settings.

A single girder overhead crane is a versatile material handling equipment designed for lifting and moving loads in industrial settings. Composed of a single main beam (girder) supported by end carriages, a trolley, and a hoist, this crane operates on elevated runways, maximizing floor space utilization. Ideal for light to medium-duty applications, it balances cost-effectiveness, compact design, and reliable performance—making it a go-to choice for factories, sklady, and workshops seeking efficient load management.

Our single girder overhead cranes are engineered to meet rigorous industrial demands, with features that set them apart:

|
Parameter
|
Range/Details
|
|
Lifting Capacity
|
0.5 – 32 ton (customizable for higher capacities upon request)
|
|
Span Length
|
5 – 30 meters (adjustable based on facility dimensions)
|
|
Výška zdvihu
|
3 – 30 meters (extendable with specialized configurations)
|
|
Robotnícka trieda
|
A3 – A5 (suitable for medium-duty, intermittent operations)
|
|
Hoist Speed
|
0.8 – 16 m/min (variable speed options available)
|
|
Trolley Travel Speed
|
10 – 30 m/min
|
|
Crane Travel Speed
|
20 – 45 m/min
|
|
Napájanie
|
380V/3PH/50Hz (customizable for 220V, 440V, or other regional standards)
|
|
Kontrolný systém
|
Pendant control, diaľkové ovládanie (wireless optional), or PLC integration
|

Our single girder overhead cranes excel in diverse sectors, streamlining material handling across:
Q1: What’s the difference between a single girder and double girder overhead crane?
A1: Single girder cranes use one main beam, are lighter, more affordable, and ideal for light to medium loads. Double girder overhead cranes have two beams, offering higher lifting capacities (32+ ton) and greater stability for heavy-duty applications.
Q2: Can a single girder overhead crane be installed outdoors?
A2: Yes—we offer weatherproof models with corrosion-resistant coatings, sealed electrical components, and rain shields, suitable for outdoor yards or construction sites.
Q3: How long does installation take?
A3: Installation typically takes 3–7 days, depending on the crane size, site preparation (napr., runway setup), and configuration complexity. Our team provides on-site support for seamless setup.
Q4: What maintenance is required?
A4: Regular maintenance includes checking hoist cables for wear, lubricating trolley/overhead crane wheels, testing safety switches, and inspecting electrical connections. We recommend quarterly inspections for optimal performance.
Q5: Are your cranes compliant with international standards?
A5: Absolutely. All our single girder overhead cranes meet ISO 9001 quality standards, CE certification for EU markets, and OSHA guidelines for safety, ensuring global compatibility.
Zdieľať pomocou PDF: Stiahnuť


Ceníme si vašu spätnú väzbu! Vyplňte prosím nižšie uvedený formulár, aby sme mohli naše služby prispôsobiť vašim špecifickým potrebám.
The 60 tons gantry crane is a professional heavy-duty material handling solution enginee……
Objavte viac →
Ako základné zariadenie v ťažkých priemyselných zdvíhacích operáciách, a 90 tony mostový žeriav....
Objavte viac →
30 Tony mostový žeriav: Heavy-Duty Material Handling Solution The 30 tons overhead cra……
Objavte viac →
Kliknutím na tlačidlo získate informácie o produkte a cenové ponuky na WhatsApp.
ZÍSKAJTE CENU
Najnovšie komentáre