A single girder overhead crane is a versatile material handling equipment designed for lifting and moving loads in industrial settings.

A single girder overhead crane is a versatile material handling equipment designed for lifting and moving loads in industrial settings. Composed of a single main beam (girder) supported by end carriages, a trolley, and a hoist, this crane operates on elevated runways, maximizing floor space utilization. Ideal for light to medium-duty applications, it balances cost-effectiveness, compact design, and reliable performance—making it a go-to choice for factories, склады, and workshops seeking efficient load management.

Our single girder overhead cranes are engineered to meet rigorous industrial demands, with features that set them apart:

|
Параметр
|
Range/Details
|
|
Подъемная способность
|
0.5 - 32 тонны (customizable for higher capacities upon request)
|
|
Длина пролета
|
5 - 30 метры (adjustable based on facility dimensions)
|
|
Высота подъема
|
3 - 30 метры (extendable with specialized configurations)
|
|
Рабочий класс
|
А3 – А5 (suitable for medium-duty, intermittent operations)
|
|
Hoist Speed
|
0.8 - 16 м/мой (доступны варианты с переменной скоростью)
|
|
Скорость движения тележки
|
10 - 30 м/мой
|
|
Crane Travel Speed
|
20 - 45 м/мой
|
|
Источник питания
|
380V/3PH/50Hz (customizable for 220V, 440V., or other regional standards)
|
|
Система управления
|
Контроль подвеска, Дистанционное управление (wireless optional), or PLC integration
|

Our single girder overhead cranes excel in diverse sectors, streamlining material handling across:
Q1: What’s the difference between a single girder and двухбалочный мостовой кран?
A1: Single girder cranes use one main beam, are lighter, more affordable, and ideal for light to medium loads. Double girder overhead cranes have two beams, offering higher lifting capacities (32+ тонны) and greater stability for heavy-duty applications.
Q2: Can a single girder overhead crane be installed outdoors?
A2: Yes—we offer weatherproof models with corrosion-resistant coatings, sealed electrical components, and rain shields, suitable for outdoor yards or construction sites.
Q3: How long does installation take?
А3: Installation typically takes 3–7 days, depending on the crane size, site preparation (НАПРИМЕР., runway setup), and configuration complexity. Our team provides on-site support for seamless setup.
Q4: What maintenance is required?
A4: Regular maintenance includes checking hoist cables for wear, lubricating trolley/overhead crane wheels, testing safety switches, and inspecting electrical connections. We recommend quarterly inspections for optimal performance.
Q5: Are your cranes compliant with international standards?
А5: Absolutely. All our single girder overhead cranes meet ISO 9001 quality standards, CE certification for EU markets, and OSHA guidelines for safety, ensuring global compatibility.
Поделиться в формате PDF: Скачать


Мы ценим ваши отзывы! Пожалуйста, заполните форму ниже, чтобы мы могли адаптировать наши услуги к вашим конкретным потребностям.
30 Тонн мостовой кран: Heavy-Duty Material Handling Solution The 30 tons overhead cra……
Откройте для себя больше →
The electric chain hoist with trolley is an integrated lifting equipment designed to de……
Откройте для себя больше →
Что такое кран EOT? Структурная схема крана EOT Кран EOT является фундаментальной частью e……
Откройте для себя больше →
Нажмите кнопку, чтобы получить информацию о продукте и цитаты на WhatsApp.
Получите цитату
Последние комментарии