How often should overhead cranes be inspected?

2026-02-25

overhead crane inspection

Overhead crane inspection is one of the most critical practices for workplace safety, соответствие нормативным требованиям, and equipment longevity. Whether you run a manufacturing plant, склад, construction site, or logistics center, knowing the correct inspection schedule protects your team, сокращает время простоя, and avoids costly violations. In this post, we break down how often overhead cranes should be inspected based on industry standards and best practices.

Why Overhead Crane Inspection Is Non-Negotiable

Мостовые краны handle heavy loads in demanding environments. Wear, усталость, коррозия, and mechanical failure can develop slowly but lead to serious accidents. Regular overhead crane inspection:

No matter how new or reliable your crane seems, skipping inspections creates unnecessary risk.

overhead crane inspection

Standard Overhead Crane Inspection Frequencies

Industry guidelines (Оша, АСМЭ Б30.2, CMAA) divide overhead crane inspection into two main categories: frequent inspections and periodic inspections.

1. Частые проверки (Daily to Monthly)

These are visual and functional checks performed by operators or trained maintenance staff.

2. Periodic Inspections (1–12 Months)

These are comprehensive inspections performed by a qualified person or certified technician. Frequency depends on usage severity:

All cranes require at least one full periodic inspection per year.

overhead crane inspection

When to Inspect Immediately (Outside the Schedule)

You must perform an immediate overhead crane inspection if:

Never operate a crane that fails any inspection step.

Key Items Covered in Overhead Crane Inspection

A complete inspection covers the entire system:

Documentation is mandatory for compliance.

overhead crane inspection

How to Build a Compliant Inspection Plan

overhead crane inspection

Заключительные мысли

How often should overhead cranes be inspected? The short answer: daily by operators, monthly in detail, and at least annually by a qualified inspector — with more frequent checks for heavy-use equipment.

Overhead crane inspection is not just a regulatory box to check; it is a foundational safety practice. A consistent, well-documented inspection program keeps your operation safe, эффективный, and reliable.

Предыдущая статья:
Следующая статья:

Get Solution & Price Right Now!

Мы ценим ваши отзывы! Пожалуйста, заполните форму ниже, чтобы мы могли адаптировать наши услуги к вашим конкретным потребностям.

Имя:
* Электронная почта:
WhatsApp / Номер телефона:
Расположение проекта:
* Сообщение:

Последние комментарии

Садох Гани Саид:
Серьга, Тип болта, Поклон, Г-2130 8,5Т, Hot Dipped Galvanized 25Pcs Air Winch, Capacity-22000 LBS/10 TON 1Pcs Traveling Crane Hook Block Assembly ; Load Capacity-30 TON 1Pcs 6x19-IWRC, Диаметр-7/8 дюймов/ 22 ММ, оцинкованный, 1770МПа, МБЛ 305КН, Length 250M/Reel 1Reel Wire Rope Clip,7/8Дюйм, 22мм, Hot dipped galvanized 10Pcs Grommet Sling, Диаметр 1 1/4 Дюйм, 32 ММ, 6 x37-ФК, оцинкованный, Длина: 6 Ft per pcs 20Pcs 8 Швартовный канат из полипропилена, Диаметр 80 мм, Длина 220м/мотка, Всего 10 катушек
enorm-services Саид:
50t swl crane hook swivel and rotating attachement
ДМ Шривастав Саид:
Привет, Мы ищем КРЮК С ХВОСТОВИКОМ. - 30Тоннная грузоподъемность согласно ASME 30.10 СТД. Please share your Best Quotation for the HOOK and GA for HOOK Thanks & Внимание.

Связанные случаи

WhatsApp

Связаться с нами

Нажмите кнопку, чтобы получить информацию о продукте и цитаты на WhatsApp.

Получите цитату
WhatsApp
Расследование
× Weihua Crane примет участие в выставке CONEXPO-CON/AGG 2026