Overhead cranes for aluminium smelter are specifically engineered to meet these rigorous demands, serving as the backbone of material transportation and process coordination in smelting plants.
Aluminium smelter operations are characterized by harsh working environments, high-temperature conditions, and heavy-duty material handling requirements. Overhead cranes for aluminium smelter are specifically engineered to meet these rigorous demands, serving as the backbone of material transportation and process coordination in smelting plants. Designed with advanced technology and robust structures, these cranes ensure safe, efficace, and reliable operation, directly contributing to the stability and productivity of aluminium smelting processes.

|
Paramètre
|
Standard Specification
|
Customization Notes
|
|---|---|---|
|
Capacité de levage nominale
|
50t – 300t
|
Available for higher capacity on demand
|
|
Portée
|
10m – 30m
|
Customizable based on smelter plant layout
|
|
Hauteur de levage
|
8m – 25m
|
Adjustable to match smelter workshop height
|
|
Vitesse de levage
|
0.5m/min – 10 m/min
|
Stepless speed regulation supported
|
|
Vitesse de déplacement du chariot
|
5m/min – 30 m/min
|
Frequency conversion speed control optional
|
|
Bridge Travel Speed
|
10m/min – 45m/min
|
Frequency conversion speed control optional
|
|
Classe ouvrière
|
A6 – A8
|
Suitable for heavy/extra-heavy duty smelting conditions
|
|
Ambient Temperature Resistance
|
-20°C – 600°C
|
Equipped with special high-temperature protection system
|
|
Alimentation électrique
|
380V/50 Hz, 3-phase
|
Customizable for 400V/50Hz, 480V/60Hz etc. per regional standards
|



Overhead cranes for aluminium smelter play an indispensable role in various links of the aluminium smelting process, covering raw material handling, electrolysis production, and finished product processing. Their specific applications are as follows:

En résumé, overhead cranes for aluminium smelter are customized to adapt to the harsh and complex working conditions of aluminium smelters. With their unique features, precise parameters, and wide-ranging applications, they provide strong support for the efficient, sûr, and continuous operation of aluminium smelting processes. Choosing the right overhead crane is crucial for improving the productivity and operational safety of aluminium smelters.
Partager avec PDF: Télécharger




Nous apprécions vos commentaires! Veuillez remplir le formulaire ci-dessous afin que nous puissions adapter nos services à vos besoins spécifiques.
10 Tonnes de poutres doubles (Eot) Aperçu des produits de grue Le 10 Tonnes Bipoutre ……
Découvrir plus →
Dans le monde exigeant de la manutention, construction, et soulever des charges lourdes, chaque comp……
Découvrir plus →
Product Overview Our CE certified double girder overhead crane is a premium lifting eq……
Découvrir plus →
Cliquez sur le bouton pour obtenir des informations et des citations de produits sur WhatsApp.
Obtenez un devis
Dernières commentaires