A single girder overhead crane is a versatile material handling equipment designed for lifting and moving loads in industrial settings.

A single girder overhead crane is a versatile material handling equipment designed for lifting and moving loads in industrial settings. Composed of a single main beam (girder) supported by end carriages, a trolley, and a hoist, this crane operates on elevated runways, maximizing floor space utilization. Ideal for light to medium-duty applications, it balances cost-effectiveness, compact design, and reliable performance—making it a go-to choice for factories, Lagerhäuser, and workshops seeking efficient load management.

Our single girder overhead cranes are engineered to meet rigorous industrial demands, with features that set them apart:

|
Parameter
|
Range/Details
|
|
Hebekapazität
|
0.5 - - 32 Tonnen (customizable for higher capacities upon request)
|
|
Spanne Länge
|
5 - - 30 Meter (adjustable based on facility dimensions)
|
|
Hebenshöhe
|
3 - - 30 Meter (extendable with specialized configurations)
|
|
Arbeiterklasse
|
A3 – A5 (suitable for medium-duty, intermittent operations)
|
|
Hoist Speed
|
0.8 - - 16 m/min (Optionen mit variabler Geschwindigkeit verfügbar)
|
|
Trolley Travel Speed
|
10 - - 30 m/min
|
|
Crane Travel Speed
|
20 - - 45 m/min
|
|
Stromversorgung
|
380V/3PH/50Hz (customizable for 220V, 440V, or other regional standards)
|
|
Steuerungssystem
|
Pendelsteuerung, Fernbedienung (wireless optional), or PLC integration
|

Our single girder overhead cranes excel in diverse sectors, streamlining material handling across:
Q1: What’s the difference between a single girder and Zweiträger-Laufkran?
A1: Single girder cranes use one main beam, are lighter, more affordable, and ideal for light to medium loads. Double girder overhead cranes have two beams, offering higher lifting capacities (32+ Tonnen) and greater stability for heavy-duty applications.
Q2: Can a single girder overhead crane be installed outdoors?
A2: Yes—we offer weatherproof models with corrosion-resistant coatings, sealed electrical components, and rain shields, suitable for outdoor yards or construction sites.
Q3: How long does installation take?
A3: Installation typically takes 3–7 days, depending on the crane size, site preparation (Z.B., runway setup), and configuration complexity. Our team provides on-site support for seamless setup.
Q4: What maintenance is required?
A4: Regular maintenance includes checking hoist cables for wear, lubricating trolley/overhead crane wheels, testing safety switches, and inspecting electrical connections. We recommend quarterly inspections for optimal performance.
Q5: Are your cranes compliant with international standards?
A5: Absolutely. All our single girder overhead cranes meet ISO 9001 quality standards, CE certification for EU markets, and OSHA guidelines for safety, ensuring global compatibility.
Mit PDF teilen: Herunterladen


Wir schätzen Ihr Feedback! Bitte füllen Sie das folgende Formular aus, damit wir unsere Dienste auf Ihre spezifischen Anforderungen anpassen können.
WEIHUA Brückenkran PDF-Daten herunterladen: Herunterladen Entworfen mit einem einzigen Balken und elektrischem……
Entdecken Sie mehr →
30 Tonnen-Laufkran: Heavy-Duty Material Handling Solution The 30 tons overhead cra……
Entdecken Sie mehr →
Introduction to Double Girder Overhead Cranes A double girder overhead crane is a robu……
Entdecken Sie mehr →
Klicken Sie auf die Schaltfläche, um Produktinformationen und Angebote auf WhatsApp zu erhalten.
Holen Sie sich Zitat
Neueste Kommentare