Heim » Produkte » Überkopfkran » Doppelträger-EOT-Kran

Doppelträger-EOT-Kran

Ein Doppelträger-EOT (Elektrisches Überkopffahren) crane is a robust, overhead lifting system designed for heavy-duty material handling in industrial environments.

WhatsAppAnfrage

Was ist ein Doppelträger-EOT-Kran??

Doppelträger-EOT-Kran

Ein Doppelträger-EOT (Elektrisches Überkopffahren) crane is a robust, overhead lifting system designed for heavy-duty material handling in industrial environments. Im Gegensatz zu single girder EOT crane, it features two parallel main girders spanning the workspace, supported by end carriages that travel along elevated runways. This structure enables it to handle significantly higher loads—typically ranging from 10 Tonnen zu 500 tons or more—making it ideal for demanding lifting tasks where precision, Stabilität, and durability are critical.

Powered by an electric motor, the double girder EOT crane operates via a hoist (mounted on a trolley) that moves along the girders, combined with runway travel for full coverage of the workspace. It is widely recognized as a reliable solution for streamlining operations in factories, Lagerhäuser, and heavy industries.

Key Features of Double Girder EOT Cranes

Doppelträger-EOT-Kran

Double girder EOT cranes stand out for their advanced design and performance, offering the following advantages:

Technical Parameters of Double Girder EOT Crane

Doppelträger-EOT-Kran

Parameter
Bereich/Details
Nenntragfähigkeit
10t–500t+ (customizable for ultra-heavy loads)
Spanne Länge
10m–35m (longer spans available with structural reinforcement)
Hebenshöhe
6m–30m (adjustable based on workspace height)
Arbeiterklasse
A5–A8 (ISO -Standard; A8 for continuous heavy-duty operations)
Hubgeschwindigkeit
0.5m/min–10m/min (variable frequency control for smooth speed adjustment)
Fahrgeschwindigkeit des Trolleys
10m/min–40m/min
Kranfahrgeschwindigkeit
20m/min–60m/min
Stromversorgung
380V/50Hz (customizable for 220V/60Hz or other voltages)
Steuermodus
Pendelsteuerung, kabellose Fernbedienung, oder Kabinensteuerung
Sicherheitsmerkmale
Überlastschutz, Endschalter, Notstopp, anti-collision devices

Structural Components of Double Girder EOT Crane

A double girder EOT crane consists of several key components working together to ensure reliable lifting:

1. Hauptträger

Hauptträger des Laufkrans

Two parallel box-type or I-beam steel girders forming the primary load-bearing structure, spanning the workspace.

2. Endwagen

Endbalken

Located at both ends of the main girders, equipped with wheels that travel along the runway rails, enabling the crane to move horizontally.

3. Hissen & Wagen

Wagen

The hoist (electric winch with hook, magnet, or grab) is mounted on a trolley, which travels along the main girders via rails, allowing vertical lifting and horizontal movement along the span.

4. Runway System

 

Elevated rails (installed on columns or walls) that guide the crane’s end carriages, defining the crane’s travel range.

5. Elektrisches System

Kranstromabnehmer

 

Inklusive Motoren (hissen, Wagen, crane travel), Bedienfelder, Kabel, und Sicherheitsvorrichtungen (overload sensors, Endschalter) to manage power and operations.

6. Drivers cab

Drivers cab

Double Girder EOT Crane Manufacturing Process

Double girder EOT crane manufacturing process

Industry Applications of Double Girder EOT Cranes

Double girder EOT cranes are indispensable in industries requiring heavy lifting and precise material handling:

Zweiträger-EOT-Kran

FAQs About Double Girder EOT Cranes

Q1: What’s the difference between a double girder and single girder EOT crane?

A: Zweiträgerkrane haben zwei Hauptträger, bietet eine höhere Tragfähigkeit (10t+) und Stabilität, suitable for heavy-duty use. Single girder cranes have one girder, ideal for lighter loads (up to 20t) and smaller workspaces.

Q2: How often should a double girder EOT crane be maintained?

A: Routineinspektionen (tägliche Kontrolle auf Abnutzung, monthly lubrication) and annual professional maintenance are recommended to ensure safety and extend service life.

Q3: Can double girder EOT cranes be customized for special environments?

A: Ja. Options include explosion-proof designs (for hazardous areas), corrosion-resistant coatings (for chemical plants), and high-temperature resistance (for foundries).

Q4: What safety standards do double girder EOT cranes comply with?

A: They adhere to international standards such as ISO, Fem, AUS, und OSHA, with built-in safety features like overload protection and emergency stops.

F5: How long does it take to install a double girder EOT crane?

A: Installation time varies by size and complexity—typically 2–4 weeks for standard models, with longer timelines for custom or large-span systems.

Whether you need to lift heavy machinery in a factory or handle bulk materials in a port, our double girder EOT cranes deliver the strength, Präzision, and reliability to optimize your operations. Contact us for a custom solution tailored to your needs.

Mit PDF teilen: Herunterladen

Hersteller

Krantransport

Get Solution & Price Right Now!

Wir schätzen Ihr Feedback! Bitte füllen Sie das folgende Formular aus, damit wir unsere Dienste auf Ihre spezifischen Anforderungen anpassen können.

Name:
* E-Mail:
WhatsApp / Telefonnummer:
Projektort:
* Nachricht:

Neueste Kommentare

Joseph Ainoo sagte:
Bitte ich benötige den elektrischen Schaltplan für den 3-Tonnen-Laufkran (Weihua) NEIN. 2000266711
Byeong ho yoo Sagte:
Guten Tag, Liebling, Ich möchte Sie um ein Angebot wie folgt bitten, 1. Robustes Stahlrad 2. Größe: 300mm OD x 80mm thickness x 50mm shaft hole 3.Material: Baustahl 4. Benötigte Menge: 192ea This requestions is for the investment plan. Please me know your estimate price Regards B.H.YOO
Anna Vlasnita sagte:
Guten Tag! Mein Name ist Anna, und ich vertrete das rumänische Unternehmen. We are looking to purchase overhead cranes with the following specifications: 2.5T. Spannweite 50m, Spannweite 18m - 4 Einheiten. 8T. Spannweite 60m, Spannweite 18m - 3 Einheiten. 25T. Spannweite 50m, Spannweite 18m - 1 Einheit. Alle Kräne müssen über eine Fernbedienung verfügen. Können Sie mir Ihre Preise per E-Mail mitteilen??
Sagte Sadoh Gani:
Schäkel, Bolzentyp, Bogen, G-2130 8,5T, Hot Dipped Galvanized 25Pcs Air Winch, Capacity-22000 LBS/10 TON 1Pcs Traveling Crane Hook Block Assembly ; Load Capacity-30 TON 1Pcs 6x19-IWRC, Durchmesser: 7/8 Zoll/ 22 MM, Verzinkt, 1770MPA, MBL 305KN, Length 250M/Reel 1Reel Wire Rope Clip,7/8Zoll, 22mm, Hot dipped galvanized 10Pcs Grommet Sling, Durchmesser 1 1/4 Zoll, 32 MM, 6 x37-FC, Verzinkt, Länge: 6 Ft per pcs 20Pcs 8 Strang-Festmacherseil aus Polypropylen, Durchmesser 80mm, Länge 220 m/Spule, Insgesamt 10 Spulen
enorm-services sagte:
50t swl crane hook swivel and rotating attachement

Heißes Produkt

Verwandte Fälle

WhatsApp

Kontaktieren Sie uns

Klicken Sie auf die Schaltfläche, um Produktinformationen und Angebote auf WhatsApp zu erhalten.

Holen Sie sich Zitat
WhatsApp
Anfrage