Heim » Blog » How often should overhead cranes be inspected?

How often should overhead cranes be inspected?

2026-02-25

overhead crane inspection

Overhead crane inspection is one of the most critical practices for workplace safety, regulatory compliance, and equipment longevity. Whether you run a manufacturing plant, Lager, construction site, or logistics center, knowing the correct inspection schedule protects your team, reduces downtime, and avoids costly violations. In this post, we break down how often overhead cranes should be inspected based on industry standards and best practices.

Why Overhead Crane Inspection Is Non-Negotiable

Brückenkräne handle heavy loads in demanding environments. Tragen, Ermüdung, Korrosion, and mechanical failure can develop slowly but lead to serious accidents. Regular overhead crane inspection:

No matter how new or reliable your crane seems, skipping inspections creates unnecessary risk.

overhead crane inspection

Standard Overhead Crane Inspection Frequencies

Industry guidelines (OSHA, ASME B30.2, Cmaa) divide overhead crane inspection into two main categories: frequent inspections and periodic inspections.

1. Frequent Inspections (Daily to Monthly)

These are visual and functional checks performed by operators or trained maintenance staff.

2. Periodic Inspections (1–12 Months)

These are comprehensive inspections performed by a qualified person or certified technician. Frequency depends on usage severity:

All cranes require at least one full periodic inspection per year.

overhead crane inspection

When to Inspect Immediately (Outside the Schedule)

You must perform an immediate overhead crane inspection if:

Never operate a crane that fails any inspection step.

Key Items Covered in Overhead Crane Inspection

A complete inspection covers the entire system:

Documentation is mandatory for compliance.

overhead crane inspection

How to Build a Compliant Inspection Plan

overhead crane inspection

Letzte Gedanken

How often should overhead cranes be inspected? The short answer: daily by operators, monthly in detail, and at least annually by a qualified inspector — with more frequent checks for heavy-use equipment.

Overhead crane inspection is not just a regulatory box to check; it is a foundational safety practice. A consistent, well-documented inspection program keeps your operation safe, effizient, and reliable.

Vorab -Artikel:
Nächster Artikel:

Get Solution & Price Right Now!

Wir schätzen Ihr Feedback! Bitte füllen Sie das folgende Formular aus, damit wir unsere Dienste auf Ihre spezifischen Anforderungen anpassen können.

Name:
* E-Mail:
WhatsApp / Telefonnummer:
Projektort:
* Nachricht:

Neueste Kommentare

Sagte Sadoh Gani:
Schäkel, Bolzentyp, Bogen, G-2130 8,5T, Hot Dipped Galvanized 25Pcs Air Winch, Capacity-22000 LBS/10 TON 1Pcs Traveling Crane Hook Block Assembly ; Load Capacity-30 TON 1Pcs 6x19-IWRC, Durchmesser: 7/8 Zoll/ 22 MM, Verzinkt, 1770MPA, MBL 305KN, Length 250M/Reel 1Reel Wire Rope Clip,7/8Zoll, 22mm, Hot dipped galvanized 10Pcs Grommet Sling, Durchmesser 1 1/4 Zoll, 32 MM, 6 x37-FC, Verzinkt, Länge: 6 Ft per pcs 20Pcs 8 Strang-Festmacherseil aus Polypropylen, Durchmesser 80mm, Länge 220 m/Spule, Insgesamt 10 Spulen
enorm-services sagte:
50t swl crane hook swivel and rotating attachement
DM Shrivastav sagte:
Hallo, Wir sind auf der Suche nach HAKEN MIT SCHAFT - 30Tonnenkapazität gemäß ASME 30.10 STD. Please share your Best Quotation for the HOOK and GA for HOOK Thanks & Betrachten.

Verwandte Fälle

WhatsApp

Kontaktieren Sie uns

Klicken Sie auf die Schaltfläche, um Produktinformationen und Angebote auf WhatsApp zu erhalten.

Holen Sie sich Zitat
WhatsApp
Anfrage
× Weihua Crane wird auf der CONEXPO-CON/AGG ausstellen 2026