A single girder overhead crane is a versatile material handling equipment designed for lifting and moving loads in industrial settings.

A single girder overhead crane is a versatile material handling equipment designed for lifting and moving loads in industrial settings. Composed of a single main beam (girder) supported by end carriages, a trolley, and a hoist, this crane operates on elevated runways, maximizing floor space utilization. Ideal for light to medium-duty applications, it balances cost-effectiveness, compact design, and reliable performance—making it a go-to choice for factories, sklady, and workshops seeking efficient load management.

Our single girder overhead cranes are engineered to meet rigorous industrial demands, with features that set them apart:

|
Parametr
|
Range/Details
|
|
Zvedací kapacita
|
0.5 - 32 tuny (customizable for higher capacities upon request)
|
|
Délka rozpětí
|
5 - 30 metry (adjustable based on facility dimensions)
|
|
Výška zvedání
|
3 - 30 metry (extendable with specialized configurations)
|
|
Dělnická třída
|
A3 – A5 (suitable for medium-duty, intermittent operations)
|
|
Hoist Speed
|
0.8 - 16 m/min (variable speed options available)
|
|
Trolley Travel Speed
|
10 - 30 m/min
|
|
Crane Travel Speed
|
20 - 45 m/min
|
|
Napájení
|
380V/3PH/50Hz (customizable for 220V, 440PROTI, or other regional standards)
|
|
Řídicí systém
|
Pendant control, remote control (wireless optional), or PLC integration
|

Our single girder overhead cranes excel in diverse sectors, streamlining material handling across:
Q1: What’s the difference between a single girder and double girder overhead crane?
A1: Single girder cranes use one main beam, are lighter, more affordable, and ideal for light to medium loads. Double girder overhead cranes have two beams, offering higher lifting capacities (32+ tuny) and greater stability for heavy-duty applications.
Q2: Can a single girder overhead crane be installed outdoors?
A2: Yes—we offer weatherproof models with corrosion-resistant coatings, sealed electrical components, and rain shields, suitable for outdoor yards or construction sites.
Q3: How long does installation take?
A3: Installation typically takes 3–7 days, depending on the crane size, site preparation (NAPŘ., runway setup), and configuration complexity. Our team provides on-site support for seamless setup.
Q4: What maintenance is required?
A4: Regular maintenance includes checking hoist cables for wear, lubricating trolley/overhead crane wheels, testing safety switches, and inspecting electrical connections. We recommend quarterly inspections for optimal performance.
Q5: Are your cranes compliant with international standards?
A5: Absolutely. All our single girder overhead cranes meet ISO 9001 quality standards, CE certification for EU markets, and OSHA guidelines for safety, ensuring global compatibility.
Share with PDF: Download


Vážíme si vaší zpětné vazby! Vyplňte prosím níže uvedený formulář, abychom mohli přizpůsobit naše služby vašim konkrétním potřebám.
As one of the most critical pieces of equipment in container terminals, STS cranes ensur……
Objevte více →
10 Tons Double Girder Overhead (EOT) Crane Product Overview The 10 Tons Double Girder ……
Objevte více →
Product Overview Rubber Tyred Gantry (RTG) cranes are essential material handling equi……
Objevte více →
Kliknutím na tlačítko získáte informace o produktu a nabídky na WhatsApp.
Získejte citát
Nejnovější komentáře