Domov » Produkty » Nadzemní jeřáb » 250 Ton Scrap Charging Overhead Crane

250 Ton Scrap Charging Overhead Crane

250 ton scrap charging overhead crane for steel mill converter charging bay. Heavy-duty A7/A8 grade overhead crane with electromagnetic chuck and scrap grab, designed for grabbing, lifting and feeding scrap steel to converters, featuring high safety, high temperature resistance and customizable parameters.

WhatsappDotaz

The 250 ton scrap charging overhead crane is a heavy-duty, metallurgy-grade overhead travelling crane specially designed for the converter charging bay of steelmaking plants. It serves as the core handling equipment for the steelmaking scrap feeding process, mainly responsible for grabbing, zdvihání, transporting and tipping scrap steel buckets to complete quantitative and efficient scrap charging for converters. Tailored for the high-frequency, high-intensity and harsh working conditions of steelmaking workshops including high temperature, dust pollution and heavy-load continuous operation, this crane supports flexible switching of auxiliary attachments such as electromagnetic chucks and mechanical scrap grabs, realizing integrated operations of bulk scrap steel grabbing, bucket handling and converter feeding, which greatly improves the automation and efficiency of the steelmaking scrap charging process.

250 Ton Scrap Charging Overhead Crane

250 Ton Scrap Charging Overhead Crane

250 Ton Scrap Charging Overhead Crane Performance Parameters

Položka parametru
Technická specifikace
Rated Lifting Capacity
250 Tón (Hlavní hák)
Working Grade
A7 / A8 (Metallurgical Heavy Duty)
Výška zvedání
Customized 24m – 30m
Rozpětí
Customized 10.5m – 31.5m
Rychlost zvedání
0.4 – 10m/min (Nastavitelná frekvence)
Trolley Traveling Speed
20 – 40m/min (Nastavitelná frekvence)
Rychlost pojezdu jeřábu
20 – 40m/min (Nastavitelná frekvence)
Matching Attachments
Electromagnetic Chuck / Mechanical Scrap Grab
Použitelné prostředí
Vysoká teplota, prach, continuous heavy-load operation

Core Working Application & Matching Attachments

This overhead crane is exclusively applied to the converter charging cross operation area in iron and steel smelting enterprises, covering the whole process from scrap yard material transfer to converter furnace feeding. It can be equipped with two mainstream working attachments according to actual production demands to adapt to different scrap steel handling scenarios:

250 Ton Scrap Charging Overhead Crane

250 Ton Scrap Charging Overhead Crane

With dual-attachment switching capability, the crane can independently complete full-process operations including scrap steel loading from the stockyard, precise transportation of scrap buckets, accurate positioning above the converter and automatic tipping feeding, perfectly matching the continuous and high-efficiency production rhythm of modern steelmaking lines.

Konstrukční návrh & Technické výhody

Adopting heavy-duty double-girder bridge structure and A7/A8 high working grade design, the crane fully meets the long-term continuous heavy-load operation requirements of metallurgical workshops. The main beam is made of high-strength low-alloy steel, which undergoes integral welding, stress relief annealing and precision machining, featuring high rigidity, strong bearing capacity and small deformation, ensuring stable operation under 250-ton rated load for a long time.

250 Ton Scrap Charging Overhead Crane

The lifting mechanism adopts a dual-hoist redundant design with independent main and auxiliary lifting systems. The main hook undertakes heavy-load lifting of scrap steel buckets, while the auxiliary hook assists in bucket tilting, fine positioning and residual material cleaning, realizing collaborative operation and improving feeding accuracy. All walking and lifting mechanisms are equipped with frequency conversion speed regulation systems, umožňující hladký start, stop and stepless speed adjustment, effectively preventing load sway and ensuring precise positioning during converter charging.

In view of the harsh metallurgical working environment, the whole machine is designed with high temperature resistance, dust resistance and corrosion resistance. Klíčové komponenty, jako jsou motory, reducers and electrical control cabinets adopt industrial high-temperature resistant models, with sealed and dust-proof structures to adapt to high-temperature radiation and dust-filled workshop environments, reducing equipment failure rate and extending service life.

Komplexní bezpečnostní ochranný systém

As key high-risk equipment for steelmaking production, this 250-ton scrap charging overhead crane is equipped with full redundant safety protection devices to ensure zero-risk operation in heavy-load and high-temperature scenarios:

250 Ton Scrap Charging Overhead Crane Advantages & Hodnota

This 250-ton scrap charging overhead crane integrates high load capacity, high efficiency and high safety, perfectly matching the intensive production mode of modern steel mills. The flexible switching of electromagnetic chuck and scrap grab realizes full coverage of various scrap steel materials, greatly improving scrap feeding efficiency and reducing manual intervention. The high-grade heavy-duty structure and environmental adaptive design ensure stable long-term operation, reduce equipment maintenance frequency and production downtime. The intelligent monitoring and precise control system improve the accuracy of converter charging, stabilize steelmaking quality, and effectively reduce production costs, becoming an indispensable core handling equipment for medium and large steelmaking converter production lines.

FAQ: 250 Ton Scrap Charging Overhead Crane

Q1: What is the main application scenario of the 250 ton scrap charging overhead crane?

A1: This heavy-duty overhead crane is specially customized for the converter charging bay of steelmaking plants. It is mainly used for grabbing, lifting and transporting scrap steel buckets, and completing accurate scrap steel feeding operations for steelmaking converters, adapting to high-frequency, continuous heavy-load operation in harsh steel workshop environments.

Q2: What attachments can this scrap charging overhead crane be equipped with?

A2: It supports two core matching attachments for flexible switching: electromagnetic chucks and mechanical scrap grabs. The electromagnetic chuck is suitable for bulk, fragmented and thin-plate scrap steel rapid grabbing, while the mechanical grab is ideal for large-size, heavy and irregular scrap steel materials, covering all conventional scrap steel handling needs.

Q3: What working grade does this metallurgical scrap charging overhead crane adopt?

A3: The crane adopts A7/A8 heavy-duty working grade, which is the professional standard for metallurgical high-intensity operation. It can adapt to long-term uninterrupted heavy-load work in high-temperature, dusty steelmaking workshops, with strong durability and stable continuous operation performance.

Q4: Does the crane have complete safety protection functions?

A4: Ano. It is equipped with a full set of redundant safety systems, including dual backup brake system, multi-layer limit protection (přetížení, výška zdvihu, cestovní limit), real-time intelligent operation monitoring system, load anti-sway system and emergency stop power-off protection device, fully eliminating operation risks in heavy-load metallurgical scenarios.

Q5: Are the parameters of the scrap charging overhead crane customizable?

A5: Core parameters such as lifting height, crane span and operating speed can be customized according to the actual size of the user’s converter workshop and production process requirements, to achieve the best matching with on-site production conditions.

Q6: What environmental adaptability does the equipment have?

A6: All key components adopt high-temperature resistant, dust-proof and sealed anti-corrosion design, which can stably resist high-temperature radiation, workshop dust and harsh industrial environment erosion, effectively reduce failure rate and extend the overall service life of the equipment.

Get Solution & Price Right Now!

Vážíme si vaší zpětné vazby! Vyplňte prosím níže uvedený formulář, abychom mohli přizpůsobit naše služby vašim konkrétním potřebám.

Jméno:
* E-mail:
Whatsapp / Telefonní číslo:
Umístění projektu:
* Zpráva:

Nejnovější komentáře

Řekl Ricardo Aguilar:
Pro projekt renovace jeřábu, Potřebujeme nainstalovat klimatizační jednotku na váš web, našli jsme toto řešení. Chladicí kapacita: 2.5 KW a 7.0 KW (8,500 A 24,000 BTU/hod) Topný výkon (Volitelný): 2.0 KW a 6.0 KW Fuente de alimentación: 24V D.C. / 110V y / 230V y / 415V y, 50/60 Hz (Upřesněte požadavek) Lednička: R410A nebo ekologický R134a
Řekl:
KAPACITA 50 TON AKS ARALIK 40 METR 12 METRE KANCA ALTI RAY BOYU 250 METR, 2 MNOŽSTVÍ PORTÁLOVÝ JEŘÁB
Řekl Hubert Patino:
Vážení jeřábi Weihua, zdravím jménem GPANTEC SAC, se sídlem v Limě, Peru. Rádi bychom si vyžádali cenovou nabídku na vámi vyrobený 12tunový trhací blok. Referenční kód produktu nebo sériové číslo mostového jeřábu je 110220.075, a model snatch bloku je 12/2t-40M. Přikládáme obrázek uchopovacího bloku, který požadujeme. Požadované množství je jedna sada. Těšíme se na vaši laskavou pozornost. Upřímně.
La grange Said:
Vážený pane nebo paní, V současné době hledáme dodavatele pro uzavřený trolejový systém pro elektrické řetězové kladkostroje provozované na jednokolejných tratích. Uveďte prosím svou cenovou nabídku pro následující požadavek: Project Scope Quantity: 8 independent lines Length: 80 meters per line Total length: 640 meters Electrical Requirements Supply voltage: 400 VAC Frequency: 50 Hz Number of poles: 4 Jmenovitý proud: minimální 40 A Application Electric chain hoist Safe Working Load (SWL): 2,500 kg One hoist per line Outdoor industrial installation Protection Requirements Minimum protection class: IP43 Preferred protection class: IP54 or higher Please include in your offer Conductor rails Power feed sections Joint assemblies End caps Hangers and support brackets Current collectors Expansion sections if required Complete accessory list Documentation Required Technical datasheets. Písemné potvrzení krytí IP celého systému. Zkušební certifikáty nebo laboratorní zprávy prokazující shodu s požadavky IP43/IP54. Instalační reference pro podobný jeřáb, jednokolejka, nebo zdvihací aplikace. Prosím také uveďte: Dodací lhůta. Země výroby. Záruční doba. Incoterms. Rozpis ceny na řádek a za kompletní projekt. předem děkuji, Cédrikova stodola
HESHAM M FARGHALY Řekl:
Dear Sir Please send your quot. Pro následující hákový blok: Hákový blok 45 tons Application: over head travelling crane Hook block type - four sheaves Hook type: Forged Crane Hook . Kapacita: 45 metrických tunách (SWL) Konfigurace: Jednoduchá stopka - swivel Design standard: EN 13001‑3‑5 Material: Kovaná legovaná ocel (Q&T) Bezpečnostní faktor: ≥ 4:1 Osvědčení: V / CE / 3.1 material certificate SIMILAR TO ATTACHED DRAWING (zašlu na email info@craneihua.com) N.B. 1-Cena: síť - ex-práce 2- přepravní hmotnost & rozměry. 3- zkušební certifikát 4- osvědčení o původu

Horký produkt

Související případy

Whatsapp

Kontaktujte nás

Kliknutím na tlačítko získáte informace o produktu a nabídky na WhatsApp.

Získejte citát
Whatsapp
Dotaz