A single girder overhead crane is a versatile material handling equipment designed for lifting and moving loads in industrial settings.

A single girder overhead crane is a versatile material handling equipment designed for lifting and moving loads in industrial settings. Composed of a single main beam (girder) supported by end carriages, a trolley, and a hoist, this crane operates on elevated runways, maximizing floor space utilization. Ideal for light to medium-duty applications, it balances cost-effectiveness, compact design, and reliable performance—making it a go-to choice for factories, গুদাম, and workshops seeking efficient load management.

Our single girder overhead cranes are engineered to meet rigorous industrial demands, with features that set them apart:

|
প্যারামিটার
|
Range/Details
|
|
উত্তোলন ক্ষমতা
|
0.5 - 32 টন (customizable for higher capacities upon request)
|
|
স্প্যান দৈর্ঘ্য
|
5 - 30 মিটার (adjustable based on facility dimensions)
|
|
উত্তোলন উচ্চতা
|
3 - 30 মিটার (extendable with specialized configurations)
|
|
শ্রমিক শ্রেণি
|
A3 – A5 (suitable for medium-duty, intermittent operations)
|
|
Hoist Speed
|
0.8 - 16 মি/আমার (variable speed options available)
|
|
Trolley Travel Speed
|
10 - 30 মি/আমার
|
|
Crane Travel Speed
|
20 - 45 মি/আমার
|
|
বিদ্যুৎ সরবরাহ
|
380V/3PH/50Hz (customizable for 220V, 440V, or other regional standards)
|
|
নিয়ন্ত্রণ ব্যবস্থা
|
Pendant control, remote control (wireless optional), or PLC integration
|

Our single girder overhead cranes excel in diverse sectors, streamlining material handling across:
Q1: What’s the difference between a single girder and double girder overhead crane?
A1: Single girder cranes use one main beam, are lighter, more affordable, and ideal for light to medium loads. Double girder overhead cranes have two beams, offering higher lifting capacities (32+ টন) and greater stability for heavy-duty applications.
Q2: Can a single girder overhead crane be installed outdoors?
A2: Yes—we offer weatherproof models with corrosion-resistant coatings, sealed electrical components, and rain shields, suitable for outdoor yards or construction sites.
Q3: How long does installation take?
A3: Installation typically takes 3–7 days, depending on the crane size, site preparation (যেমন, runway setup), and configuration complexity. Our team provides on-site support for seamless setup.
Q4: What maintenance is required?
A4: Regular maintenance includes checking hoist cables for wear, lubricating trolley/overhead crane wheels, testing safety switches, and inspecting electrical connections. We recommend quarterly inspections for optimal performance.
Q5: Are your cranes compliant with international standards?
A5: Absolutely. All our single girder overhead cranes meet ISO 9001 quality standards, CE certification for EU markets, and OSHA guidelines for safety, ensuring global compatibility.
PDF এর সাথে শেয়ার করুন: ডাউনলোড করুন


আমরা আপনার মতামত মূল্য! দয়া করে নীচের ফর্মটি সম্পূর্ণ করুন যাতে আমরা আমাদের পরিষেবাগুলি আপনার নির্দিষ্ট প্রয়োজনের জন্য তৈরি করতে পারি.
ট্রলি সহ বৈদ্যুতিক চেইন উত্তোলন একটি সমন্বিত উত্তোলন সরঞ্জাম যা ডি করার জন্য ডিজাইন করা হয়েছে।
আরও আবিষ্কার করুন →
দ্য 2 tons overhead crane is a versatile and reliable lifting equipment designed to mee……
আরও আবিষ্কার করুন →
ডুয়াল গার্ডার দিয়ে সজ্জিত, এই 25 টন ডাবল গার্ডার গ্যান্ট্রি ক্রেন বৃহত্তর ছুরিকাঘাত নিশ্চিত করে……
আরও আবিষ্কার করুন →
সর্বশেষ মন্তব্য