Bối cảnh dự án

Julius Nyerere Hydropower Station, located on the Rufiji River in Tanzania, is the country’s largest hydropower project and one of the landmark energy infrastructure projects in East Africa. With a total installed capacity of 2115 MW and nine 235 MW Francis turbine-generator units, the power station is designed to greatly lift Tanzania’s national power supply capacity, support local industrial development and stabilize the regional power grid. The powerhouse requires heavy-duty lifting equipment for the installation, overhaul and maintenance of turbine runners, máy phát điện, transformers and other core heavy electromechanical components. To meet the heavy-lifting demands inside the powerhouse, a customized 400 ton overhead crane was deployed for this critical project.

Site Challenges

The project site presents multiple harsh operating conditions that raise high requirements for crane design:

400/80 ton overhead crane used at a hydropower station in Tanzania

400/80 ton overhead crane used at a hydropower station in Tanzania

Crane Solution & Main Specifications

This double-girder 400 ton overhead crane is specially engineered for hydropower powerhouse heavy lifting scenarios.

400/80 ton overhead crane used at a hydropower station in Tanzania

400/80 ton overhead crane used at a hydropower station in Tanzania

Ứng dụng & On-site Performance

Các 400 ton overhead crane undertakes the core heavy-lifting work inside the powerhouse of Julius Nyerere Hydropower Station. It is responsible for the hoisting, transportation and accurate alignment of turbine and generator components during the construction phase. After the station enters commercial operation, the crane serves as the key maintenance equipment for dismounting and reinstalling large rotating parts during scheduled overhaul.

Kể từ khi vận hành, the crane has delivered stable, reliable and precise lifting performance. Its anti-sway control greatly improves positioning accuracy when mating large precision equipment. The tropical-adapted structure reduces failure risks under humid and hot environment, cutting downtime and maintenance cost for the power plant owner TANESCO. It has become an indispensable heavy-lifting asset guaranteeing smooth construction and long-term safe operation of this flagship Tanzanian hydropower project.

Giá trị & Phần kết luận

Các 400 ton overhead crane used at the hydropower station in Tanzania provides a proven heavy-lifting solution for Julius Nyerere Hydropower Station. It matches the extreme lifting requirements of large hydropower generating units, adapts to Africa’s tough tropical working environment, and supports the successful delivery and reliable operation of Tanzania’s largest hydropower asset. This case demonstrates mature heavy cần cẩu trên cao technology applied to African hydropower EPC projects, and proves the reliability of customized heavy lifting equipment for large-scale clean energy infrastructure.

Nhà máy Vệ Hoa

Bài viết trước:
Không còn nữa, Nó đã là bài viết mới nhất

Get Solution & Price Right Now!

Chúng tôi coi trọng phản hồi của bạn! Vui lòng hoàn thành biểu mẫu bên dưới để chúng tôi có thể điều chỉnh các dịch vụ của mình theo nhu cầu cụ thể của bạn.

Tên:
* E-mail:
WhatsApp / Số điện thoại:
Vị trí dự án:
* Tin nhắn:

Nhận xét mới nhất

Vyacheslav nói:
Bộ thu dòng điện cho cần cẩu EOT
João Dantas đã nói:
Xin chào, Chúng tôi đang tìm kiếm hướng dẫn dây cáp thay thế cho GH hiện có / Cần cẩu Univiga. Thông tin có sẵn: * Nhà sản xuất cần cẩu: GH / lỗi đại học * Công suất cần cẩu: 3.2 tấn * Palăng / tài liệu tham khảo hướng dẫn dây: GHA12 * Sợi dẫn hướng dây: Tay trái * Đường kính ngoài gần đúng: 207 mm * Chiều rộng gần đúng: 50 mm * Số lượng: 1 pc The original GH spare part has a very long lead time, vì vậy chúng tôi đang tìm kiếm một sự thay thế tương thích. Nó không cần phải là phần GH gốc. Có thể chấp nhận dây dẫn hướng tương thích hoặc được sản xuất theo yêu cầu, với điều kiện là kích thước, Hướng ren và cách lắp đặt phù hợp với Palăng GHA12 hiện có. Chúng tôi hiện đang yêu cầu hình ảnh của hướng dẫn dây ban đầu, bảng tên trống và cần cẩu từ khách hàng của chúng tôi và có thể gửi chúng để đánh giá kỹ thuật của bạn. Công ty của bạn có thể sản xuất hoặc cung cấp thanh dẫn dây cáp tương thích cho ứng dụng này không? Cảm ơn.
Hak 100 tấn nói:
Hãy đưa ra lời đề nghị cho cái móc 100 tấn.
ADRIAN PEÑA đã nói:
Tôi cần cái móc (phong cách đôi) dung tích 25 tấn mét. với 4 bó lúa (14" đường kính ròng rọc) đường kính dây cáp: 5/8"
Tesfaye Melese đã nói:
40 Lắp ráp xe đẩy cần trục dầm đôi tấn với đầy đủ các phụ kiện điện và cơ khí

Các trường hợp liên quan

WhatsApp

Liên hệ với chúng tôi

Nhấp vào nút để nhận thông tin sản phẩm và báo giá trên WhatsApp.

Nhận báo giá
WhatsApp
Cuộc điều tra