Histórico do projeto

Julius Nyerere Hydropower Station, located on the Rufiji River in Tanzania, is the country’s largest hydropower project and one of the landmark energy infrastructure projects in East Africa. With a total installed capacity of 2115 MW and nine 235 MW Francis turbine-generator units, the power station is designed to greatly lift Tanzania’s national power supply capacity, support local industrial development and stabilize the regional power grid. The powerhouse requires heavy-duty lifting equipment for the installation, overhaul and maintenance of turbine runners, geradores, transformers and other core heavy electromechanical components. To meet the heavy-lifting demands inside the powerhouse, a customized 400 ton overhead crane was deployed for this critical project.

Site Challenges

The project site presents multiple harsh operating conditions that raise high requirements for crane design:

400/80 ponte rolante de uma tonelada usada em uma usina hidrelétrica na Tanzânia

400/80 ponte rolante de uma tonelada usada em uma usina hidrelétrica na Tanzânia

Crane Solution & Main Specifications

This double-girder 400 ton overhead crane is specially engineered for hydropower powerhouse heavy lifting scenarios.

400/80 ponte rolante de uma tonelada usada em uma usina hidrelétrica na Tanzânia

400/80 ponte rolante de uma tonelada usada em uma usina hidrelétrica na Tanzânia

Aplicativo & On-site Performance

O 400 ton overhead crane undertakes the core heavy-lifting work inside the powerhouse of Julius Nyerere Hydropower Station. It is responsible for the hoisting, transportation and accurate alignment of turbine and generator components during the construction phase. After the station enters commercial operation, the crane serves as the key maintenance equipment for dismounting and reinstalling large rotating parts during scheduled overhaul.

Desde o comissionamento, the crane has delivered stable, reliable and precise lifting performance. Its anti-sway control greatly improves positioning accuracy when mating large precision equipment. The tropical-adapted structure reduces failure risks under humid and hot environment, cutting downtime and maintenance cost for the power plant owner TANESCO. It has become an indispensable heavy-lifting asset guaranteeing smooth construction and long-term safe operation of this flagship Tanzanian hydropower project.

Valor & Conclusão

O 400 ton overhead crane used at the hydropower station in Tanzania provides a proven heavy-lifting solution for Julius Nyerere Hydropower Station. It matches the extreme lifting requirements of large hydropower generating units, adapts to Africa’s tough tropical working environment, and supports the successful delivery and reliable operation of Tanzania’s largest hydropower asset. This case demonstrates mature heavy ponte rolante technology applied to African hydropower EPC projects, and proves the reliability of customized heavy lifting equipment for large-scale clean energy infrastructure.

Fábrica Weihua

Artigo anterior:
Não mais, já é o artigo mais recente

Get Solution & Price Right Now!

Valorizamos seu feedback! Preencha o formulário abaixo para que possamos adaptar nossos serviços às suas necessidades específicas.

Nome:
* E-mail:
Whatsapp / Número de telefone:
Localização do projeto:
* Mensagem:

Últimos comentários

Vyacheslav disse:
Coletor de corrente para guindaste EOT
Joao Dantas Said:
Olá, Estamos procurando uma guia de cabo de aço de reposição para um GH existente / Ponte rolante Univiga. Informação disponível: * Fabricante de guindaste: GH / Erro uni * Capacidade do guindaste: 3.2 toneladas * Içar / referência de guia de corda: GHA12 * Fio guia de corda: Esquerdo * Diâmetro externo aproximado: 207 mm * Largura aproximada: 50 mm * Quantidade: 1 pc The original GH spare part has a very long lead time, então estamos procurando um substituto compatível. Não precisa ser uma peça GH original. Um guia de corda compatível ou fabricado sob medida é aceitável, desde que as dimensões, direção da rosca e instalação são adequadas para a talha GHA12 existente. No momento estamos solicitando fotos do guia de corda original, placa de identificação de tambor e guindaste de nosso cliente e pode enviá-los para sua avaliação de engenharia. Sua empresa pode fabricar ou fornecer um guia de cabo de aço compatível para esta aplicação? Obrigado.
Hak 100 toneladas disse:
Por favor faça uma oferta pelo gancho 100 tonelada.
ADRIANO PEÑA Disse:
eu preciso de gancho (estilo duplo) capacidade 25 toneladas métricas. com 4 feixes (14" polias de diâmetro) diâmetro do cabo de aço: 5/8"
Tesfaye Melese disse:
40 Conjunto do trole do guindaste aéreo da viga dobro da tonelada com acessórios elétricos e mecânicos completos

Casos relacionados

Whatsapp

Contate-nos

Clique no botão para obter informações e citações do produto no WhatsApp.

Obtenha cotação
Whatsapp
Investigação