Projectachtergrond

India’s steel industry features continuous high-load operation, hoge temperatuur, zwaar stof, flue gas corrosion and frequent cyclic lifting. Steel mill lifting equipment requires stable load-bearing capacity, excellent environmental adaptability and high safety to meet long-shift industrial production requirements.

This project targets a large integrated steel plant in eastern India, covering iron smelting, steel casting, coil rolling and finished product delivery. Previously, outdated on-site overhead cranes had insufficient load capacity and poor stability. Prone to frequent breakdowns under high-frequency heavy-load and harsh workshop conditions, they caused repeated production halts, low productivity and excessive maintenance costs.

To eliminate lifting bottlenecks, boost handling efficiency and reduce unplanned downtime, the plant upgraded its core lifting equipment. Based on local working conditions and production load demands, a customized 50-ton double girder overhead crane was installed for full-process production lifting. Na installatie, commissioning and long-term field operation, the crane perfectly adapts to the plant’s harsh environment and delivers stable, high-efficiency lifting performance.

Technical Parameters of On-Site 50 Ton-bovenloopkraan

This 50-ton double girder overhead crane is tailored for A6 heavy-duty working conditions, complying with Indian industrial power standards and on-site workshop layout. Its core technical parameters are listed below:

Technische parameter
Specific Specification
Nominaal hefvermogen
Hoofdhaak: 50T; Auxiliary hook: 10T
Werkbereik
24M (customized according to plant workshop layout)
Hefthoogte
12M
Werkklasse
A6 (heavy-duty for frequent cyclic operation)
Hefsnelheid
Hoofdhaak: 0.5-8m/mijn (variabele frequentie); Auxiliary hook: 1-12m/mijn (variabele frequentie)
Reissnelheid van de trolley
0-20m/mijn (variabele frequentie snelheidsregeling)
Kraansnelheid
0-30m/mijn (variabele frequentie snelheidsregeling)
Stroomvoorziening
380V/50Hz/3Ph (Indian industrial standard power supply)
Beschermingscijfer
IP54 (dust-proof and splash-proof)
Controlemodus
Ground wireless remote control + cab manual dual control
Safety Protection Device
Overload limit, height limit, reislimiet, power loss protection, emergency stop device, antibotsingsapparaat

Product Advantages Verified in On-Site Operation

Strong Adaptability to Steel Plant Harsh Conditions

Customized for steel mills’ high-temperature, dusty and corrosive environments, this crane adopts high-strength low-alloy steel for the main beam, featuring outstanding heat and oxidation resistance. It maintains stable structural performance without deformation during long-term continuous operation near smelting furnaces. Equipped with dustproof and heat-dissipating electrical components and IP54 protection grade, it avoids circuit and component damage from harsh conditions, supporting 24-hour stable operation for steel production.

Smooth Variable Frequency Operation & High Positioning Accuracy

Adopting full variable frequency speed regulation, the crane eliminates sudden starts, stops and load swing common in traditional cranes, ensuring smooth operation and high positioning accuracy. It greatly improves safety when lifting heavy steel ingots and molten steel ladles. The dual control mode of wireless remote control and cab operation enables flexible adjustment according to on-site conditions, reducing operational errors and improving overall working efficiency.

Complete Safety Configuration for Heavy-Duty Production

Matching steel production’s high-risk working characteristics, the crane is equipped with comprehensive safety devices including overload, height and travel limit protection, power-off braking and emergency stop functions. It automatically locks operations under abnormal conditions to prevent load falling and equipment collisions. The built-in fault self-inspection system enables maintenance personnel to quickly locate faults, eliminating potential safety hazards in daily production.

Robuuste structuur & Low On-Site Maintenance

Key load-bearing components adopt integral welding and forging technology, with high rigidity and strong fatigue resistance to adapt to A6 frequent heavy-duty cyclic work. Vulnerable parts use high-temperature and wear-resistant materials suitable for steel mill scenarios. The modular design simplifies daily inspection and parts replacement, effectively reducing on-site failure rates, maintenance workload and operational costs, and ensuring continuous production line operation.

Practical On-Site Applications in Steel Plant

Behandeling van grondstoffen

The crane undertakes stacking and transshipment of scrap steel, ijzererts, coke and other bulk raw materials in stockyards and processing areas. Its 50-ton rated load enables one-time lifting of heavy material bundles, avoiding repeated low-efficiency handling. Stable variable-frequency operation prevents material spillage, standardizes on-site stacking and ensures consistent material supply for smelting.

High-Temperature Workshop Semi-Finished Product Transfer

In high-temperature smelting and casting workshops, the crane handles molten steel ladles and steel ingot transfers. Its excellent heat resistance and operational stability adapt to intense furnace heat radiation, while precise positioning guarantees accurate pouring and docking. Dit zorgt voor continuiteit, stable smelting and casting processes and avoids product quality fluctuations from unstable lifting.

Production Equipment Maintenance & Heavy Parts Lifting

Steel plant core equipment such as smelting furnaces and rolling mills requires regular overhaul and parts replacement. This 50-ton crane is widely used for lifting and installing heavy production equipment. Flexible dual-control operation adapts to narrow, high-altitude maintenance scenarios, and reliable safety configurations guarantee heavy-duty operation safety, shortening overhaul cycles and reducing production downtime.

Finished Steel Warehousing & Shipment

In finished product warehouses, the crane is responsible for stacking, handling and truck loading of steel coils, plates and profile steels. Its stable and efficient operating speed greatly improves warehousing and delivery efficiency. Effective load swing suppression prevents finished steel surface damage and deformation, protecting product quality and supporting efficient warehouse logistics.

On-Site Operation Effect & Conclusie

After long-term field operation, the customized 50-ton overhead crane stably adapts to the plant’s high-intensity harsh working conditions with zero major safety incidents. Compared with old equipment, it increases overall handling efficiency by over 30% and reduces failure rate by 40%. It effectively cuts unplanned downtime and maintenance costs, solves long-term production lifting bottlenecks, and provides reliable heavy-duty lifting support for the steel plant’s efficient and stable operation.

Vorige artikel:
Niet meer, Het is al het nieuwste artikel

Get Solution & Price Right Now!

Wij waarderen uw feedback! Vul het onderstaande formulier in, zodat we onze services kunnen aanpassen aan uw specifieke behoeften.

Naam:
* E -mail:
Whatsapp / Telefoonnummer:
Projectlocatie:
* Bericht:

Laatste opmerkingen

HESHAM M FARGHALY zei:
Dear Sir Please send your quot. Voor het volgende haakblok: Haak blok 45 tons Application: over head travelling crane Hook block type - four sheaves Hook type: Gesmede kraanhaak . Capaciteit: 45 metrische ton (SWL) Configuratie: Enkele schacht - swivel Design standard: EN 13001‑3‑5 Material: Gesmeed gelegeerd staal (Q&T) Veiligheidsfactor: ≥ 4:1 Certificering: IN / CE / 3.1 material certificate SIMILAR TO ATTACHED DRAWING (Ik zal het naar e-mail sturen info@craneihua.com) N.B. 1-Prijs: netto - ex-werk 2- verzendgewicht & afmetingen. 3- testcertificaat 4- certificaat van oorsprong
Joseph Ainoo zei:
Ik heb het elektrische schakelschema nodig van de 3tons bovenloopkraan (weihua) Nee. 2000266711
byeong ho yo zei:
Goedemiddag, Beste, Ik zou u graag een offerte willen vragen voor het onderstaande, 1. Zwaar uitgevoerd stalen wiel 2. Maat: 300mm OD x 80mm thickness x 50mm shaft hole 3.Material: zacht staal 4. Benodigde hoeveelheid: 192ea This requestions is for the investment plan. Please me know your estimate price Regards B.H.YOO
Anna Vlasnita zei:
Goedemiddag! Mijn naam is Anna, en ik vertegenwoordig het Roemeense bedrijf. Wij zijn op zoek naar bovenloopkranen met de volgende specificaties: 2.5T. Overspanningslengte 50m, spanwijdte 18m - 4 eenheden. 8T. Overspanningslengte 60m, spanwijdte 18m - 3 eenheden. 25T. Overspanningslengte 50m, spanwijdte 18m - 1 eenheid. Alle kranen moeten een afstandsbediening hebben. Kunt u uw prijzen doorgeven aan mijn e-mail??
Sadoh Gani zei:
Sluiting, Bouttype, Boog, G-2130 8,5T, Hot Dipped Galvanized 25Pcs Air Winch, Capacity-22000 LBS/10 TON 1Pcs Traveling Crane Hook Block Assembly ; Load Capacity-30 TON 1Pcs 6x19-IWRC, Diameter-7/8 inch/ 22 MM, Gegalvaniseerd, 1770MPa, MBL305KN, Length 250M/Reel 1Reel Wire Rope Clip,7/8Duim, 22mm, Hot dipped galvanized 10Pcs Grommet Sling, Diameter 1 1/4 Duim, 32 MM, 6 x37-FC, Gegalvaniseerd, Lengte: 6 Ft per pcs 20Pcs 8 Strand van polypropyleen meertouw, Diameter 80 mm, Lengte 220m/rol, Totaal 10 spoelen

Gerelateerde gevallen

Whatsapp

Neem contact met ons op

Klik op de knop om productinformatie en offertes op WhatsApp te krijgen.

Krijg citaat
Whatsapp
Navraag