Thuis » Blog » 400 Ton Overhead Crane Used at a Hydropower Station in Tanzania

400 Ton Overhead Crane Used at a Hydropower Station in Tanzania

2026-11-18

400 ton overhead crane used at a hydropower station in Tanzania

400/80 ton overhead crane used at a hydropower station in Tanzania

Projectachtergrond

Julius Nyerere Hydropower Station, located on the Rufiji River in Tanzania, is the country’s largest hydropower project and one of the landmark energy infrastructure projects in East Africa. With a total installed capacity of 2115 MW and nine 235 MW Francis turbine-generator units, the power station is designed to greatly lift Tanzania’s national power supply capacity, support local industrial development and stabilize the regional power grid. The powerhouse requires heavy-duty lifting equipment for the installation, overhaul and maintenance of turbine runners, generatoren, transformers and other core heavy electromechanical components. To meet the heavy-lifting demands inside the powerhouse, a customized 400 ton overhead crane was deployed for this critical project.

Site Challenges

The project site presents multiple harsh operating conditions that raise high requirements for crane design:

400/80 ton overhead crane used at a hydropower station in Tanzania

400/80 ton overhead crane used at a hydropower station in Tanzania

Crane Solution & Main Specifications

This double-girder 400 ton overhead crane is specially engineered for hydropower powerhouse heavy lifting scenarios.

400/80 ton overhead crane used at a hydropower station in Tanzania

400/80 ton overhead crane used at a hydropower station in Tanzania

Sollicitatie & On-site Performance

De 400 ton overhead crane undertakes the core heavy-lifting work inside the powerhouse of Julius Nyerere Hydropower Station. It is responsible for the hoisting, transportation and accurate alignment of turbine and generator components during the construction phase. After the station enters commercial operation, the crane serves as the key maintenance equipment for dismounting and reinstalling large rotating parts during scheduled overhaul.

Sinds de inbedrijfstelling, the crane has delivered stable, reliable and precise lifting performance. Its anti-sway control greatly improves positioning accuracy when mating large precision equipment. The tropical-adapted structure reduces failure risks under humid and hot environment, cutting downtime and maintenance cost for the power plant owner TANESCO. It has become an indispensable heavy-lifting asset guaranteeing smooth construction and long-term safe operation of this flagship Tanzanian hydropower project.

Waarde & Conclusie

De 400 ton overhead crane used at the hydropower station in Tanzania provides a proven heavy-lifting solution for Julius Nyerere Hydropower Station. It matches the extreme lifting requirements of large hydropower generating units, adapts to Africa’s tough tropical working environment, and supports the successful delivery and reliable operation of Tanzania’s largest hydropower asset. This case demonstrates mature heavy bovenloopkraan technology applied to African hydropower EPC projects, and proves the reliability of customized heavy lifting equipment for large-scale clean energy infrastructure.

Weihua-fabriek

Vorige artikel:
Niet meer, Het is al het nieuwste artikel

Get Solution & Price Right Now!

Wij waarderen uw feedback! Vul het onderstaande formulier in, zodat we onze services kunnen aanpassen aan uw specifieke behoeften.

Naam:
* E -mail:
Whatsapp / Telefoonnummer:
Projectlocatie:
* Bericht:

Laatste opmerkingen

Vjatsjeslav zei:
Stroomafnemer voor EOT-kraan
João Dantas zei:
Hallo, Wij zijn op zoek naar een vervangende staalkabelgeleider voor een bestaande GH / Univiga bovenloopkraan. Beschikbare informatie: * Kraan fabrikant: GH / Uni-fout * Kraancapaciteit: 3.2 ton * Hijsen / referentie voor touwgeleiders: GHA12 * Touwgeleidingsdraad: Linker * Geschatte buitendiameter: 207 mm * Geschatte breedte: 50 mm * Hoeveelheid: 1 pc The original GH spare part has a very long lead time, Daarom zijn we op zoek naar een compatibele vervanger. Het hoeft geen origineel GH onderdeel te zijn. Een compatibele of op maat gemaakte touwgeleider is acceptabel, op voorwaarde dat de afmetingen, draadrichting en installatie zijn geschikt voor de bestaande GHA12 takel. Momenteel vragen wij om foto's van de originele touwgeleider, het naamplaatje van de trommel en kraan van onze klant en kan deze opsturen voor uw technische evaluatie. Kan uw bedrijf een compatibele staalkabelgeleider voor deze toepassing vervaardigen of leveren?? Bedankt.
Hak 100ton Said:
Doe een bod op de haak 100 ton.
ADRIAN PEÑA zei:
Ik heb een haak nodig (dubbele stijl) capaciteit 25 metrische ton. met 4 schoven (14" diameter schijven) diameter van de draadkabel: 5/8"
Tesfaye Melese zei:
40 Ton dubbele ligger bovenloopkraanwagenconstructie met volledige elektrische en mechanische accessoires

Gerelateerde gevallen

Whatsapp

Neem contact met ons op

Klik op de knop om productinformatie en offertes op WhatsApp te krijgen.

Krijg citaat
Whatsapp
Navraag