30 ton double girder overhead crane for steel coil yards. Box girder, VFD control and coil lifting beam for reliable heavy coil handling.
A 30 ton double girder overhead crane is the workhorse of a steel coil yard. It moves heavy coils from the unloading point to the storage area and feeds them to the processing lines, lifting at full rated load every cycle. The machine below is specified around that duty.

30 tons double girder overhead crane for a steel coil yard
Steel coil yards store coils that typically weigh 10–30 tons each, and a full load can pass 40 tan. Work runs in multiple shifts: coils arrive by truck or rail, are stacked in the yard, then delivered to slitting, cut-to-length, pickling or packaging lines. The crane must lift repeatedly at 30 tan, set coils down squarely in narrow aisles and beside conveyor stations, and keep running shift after shift without downtime. That duty rules out a single-girder machine. The double girder design provides the stiffness to carry a wide coil lifting beam at 30 tons and keeps the hook travel steady over the full lifting height.
| Parameter | Nilai |
|---|---|
| Kapasiti mengangkat yang dinilai | 30 t |
| Rentang | 22.5 / 25.5 / 31.5 m (adat) |
| Mengangkat ketinggian | 8–16 m (adat) |
| Duty group | A5–A7 (ISO M5–M7) |
| Mengangkat kelajuan | 0.5–7 m/min (VFD) |
| Kelajuan perjalanan troli | 5–30 m/min |
| Kelajuan perjalanan kren | 20–80 m/min |
| Bekalan kuasa | 380 V / 50 Hz, 3-fasa (pilihan) |
| Mod kawalan | Loket + wireless remote |
| Suhu kerja | -20 °C hingga +40 ° C. |
| Applicable standards | GB/T. 3811, ISO 4301, Fem 1.001 |

30 tons double girder overhead crane for a steel coil yard
Q1: Can the crane lift a coil directly without a beam?
A1: Tidak. A C-hook or coil lifting beam is required to keep the coil horizontal and prevent edge damage. The crane and the beam are matched at 40 tons during design.
S2: What span and lifting height are available?
A2: Both are custom to the building. Common spans are 22.5 m, 25.5 m and 31.5 m; lifting heights range from 8 m ke 16 m.
Q3: Can it run in an outdoor coil yard?
A3: Ya. With a rain-proof enclosure and corrosion protection it can operate outdoors; wind and temperature conditions are confirmed at the design stage.
Q4: What is the delivery and installation time?
A4: Typical delivery is 60–90 days after drawing confirmation. The supplier’s engineers can carry out installation and commissioning on site.

Kilang Kren Weihua
Kami menghargai maklum balas anda! Sila lengkapkan borang di bawah supaya kami dapat menyesuaikan perkhidmatan kami dengan keperluan khusus anda.
Kren Gantry Girder Tunggal WEIHUA: Penyelesaian Mengangkat Kecekapan Tinggi untuk Aplikasi Industri……
Ketahui lebih lanjut →
Gambaran Keseluruhan Produk Pulley tali dawai kren adalah komponen kritikal dalam mengangkat jentera ……
Ketahui lebih lanjut →
Sebagai bahagian teras peralatan angkat berat dalam pembinaan kapal moden dan jurutera luar pesisir……
Ketahui lebih lanjut →
Klik butang untuk mendapatkan maklumat produk dan petikan di WhatsApp.
Dapatkan petikan
Komen terkini