400/80 탄자니아 수력발전소에서 사용되는 톤 오버헤드 크레인
Julius Nyerere Hydropower Station, located on the Rufiji River in Tanzania, is the country’s largest hydropower project and one of the landmark energy infrastructure projects in East Africa. With a total installed capacity of 2115 MW and nine 235 MW Francis turbine-generator units, the power station is designed to greatly lift Tanzania’s national power supply capacity, support local industrial development and stabilize the regional power grid. The powerhouse requires heavy-duty lifting equipment for the installation, overhaul and maintenance of turbine runners, 발전기, transformers and other core heavy electromechanical components. To meet the heavy-lifting demands inside the powerhouse, a customized 400 ton overhead crane was deployed for this critical project.
The project site presents multiple harsh operating conditions that raise high requirements for crane design:

400/80 탄자니아 수력발전소에서 사용되는 톤 오버헤드 크레인
This double-girder 400 ton overhead crane is specially engineered for hydropower powerhouse heavy lifting scenarios.

400/80 탄자니아 수력발전소에서 사용되는 톤 오버헤드 크레인
그만큼 400 ton overhead crane undertakes the core heavy-lifting work inside the powerhouse of Julius Nyerere Hydropower Station. It is responsible for the hoisting, transportation and accurate alignment of turbine and generator components during the construction phase. After the station enters commercial operation, the crane serves as the key maintenance equipment for dismounting and reinstalling large rotating parts during scheduled overhaul.
시운전 이후, the crane has delivered stable, reliable and precise lifting performance. Its anti-sway control greatly improves positioning accuracy when mating large precision equipment. The tropical-adapted structure reduces failure risks under humid and hot environment, cutting downtime and maintenance cost for the power plant owner TANESCO. It has become an indispensable heavy-lifting asset guaranteeing smooth construction and long-term safe operation of this flagship Tanzanian hydropower project.
그만큼 400 ton overhead crane used at the hydropower station in Tanzania provides a proven heavy-lifting solution for Julius Nyerere Hydropower Station. It matches the extreme lifting requirements of large hydropower generating units, adapts to Africa’s tough tropical working environment, and supports the successful delivery and reliable operation of Tanzania’s largest hydropower asset. This case demonstrates mature heavy 오버헤드 크레인 technology applied to African hydropower EPC projects, and proves the reliability of customized heavy lifting equipment for large-scale clean energy infrastructure.