300 ton double girder gantry crane for shipyards, steel plants and precast yards. Box-girder design, 18–89 m span, completamente personalizzabile. Ottieni un preventivo gratuito.
When your operation needs to move loads of 300 tonnellate o più, day after day, a standard overhead crane is no longer enough. IL 300 ton double girder gantry crane is a heavy-duty lifting system engineered for exactly this job: two parallel box girders supported by floor-mounted legs, with a trolley that travels along the girders and hoists loads rated up to 300 tonnellate metriche.

300 ton double girder gantry crane
Its double-girder structure delivers the rigidity, stability and headroom that single-girder designs cannot offer at this capacity. That is why it is the industry-standard solution in shipbuilding, steel processing, precast concrete production, bridge construction and heavy machinery assembly — anywhere that large, expensive loads must be handled with precision and safety.
Una gru a portale (chiamata anche gru a portale) is a bridge crane whose main girders are carried by legs that run on ground-level rails, instead of being mounted on building walls or columns. The “double girder” configuration uses two parallel main girders, which allows a heavier rated capacity, greater hook travel height, and better stability than a single-girder design.

300+300 ton double girder gantry crane
A typical 300 t gantry crane consists of:
The crane handles loads through the main hook, while the auxiliary hook lifts smaller loads or flips and positions workpieces — so a single machine covers a full range of lifting tasks.
The table below shows typical configurations. Every parameter — span, altezza di sollevamento, speeds, duty class and control mode — is fully customizable to your site and application.
| Parametro | Gamma tipica / Valore |
|---|---|
| Capacità di sollevamento nominale (gancio principale) | 300 T |
| Auxiliary hook capacity | 50–80 t (opzionale) |
| Durata (distance between rails) | 18–40 m standard; 50–89 m for shipyard models (custom up to ~185 m for large yards) |
| Altezza di sollevamento | 12–30 m standard; fino a 76 m for shipbuilding applications |
| Duty class | A3-A5 (M3–M5 per ISO/FEM classification) |
| Main girder type | Box-type welded structure, Q355B low-alloy steel |
| Design standards | Fem, Iso, GB, DA; CE documentation available on request |
| Modalità di controllo | Cabina, pendente, o telecomando senza fili |
| Alimentazione elettrica | 380 V/50 Hz, 415 V/50 Hz, 480 V/60 Hz, o personalizzato |
1. Box-Type Main Girders
The two main girders are the heart of the crane. They are fabricated from Q355B low-alloy structural steel, welded with automatic submerged arc welding, and then stress-relief annealed to remove internal welding stress. This prevents deformation during long-term heavy-load operation. The girder cross-section is optimized with finite element analysis (FEA) to balance dead weight and load capacity, which means high rigidity and low deflection — critical for accurate positioning of 300-ton loads.
2. Trolley with Main and Auxiliary Hoists
The trolley carries the main hoist (300 T) and an auxiliary hoist. Heavy-duty hoisting mechanisms are designed for smooth, controlled lifting with reliable braking. Variable-frequency drive (VFD) is available for stepless, jerk-free speed control on hoisting, trolley travel and crane travel.

300 ton double girder gantry crane
3. Legs and End Carriages
The girders are supported by A-frame or U-frame box legs that give the crane a wide, stable base — essential for outdoor operation in wind. The end carriages use an integrated box structure with a three-in-one motor-reducer-brake drive unit, ensuring smooth and reliable travel along the rail.
4. Electrical and Safety Systems
Ogni 300 t gantry crane is fitted with comprehensive protection, compreso:
The crane is designed in compliance with international crane standards, compreso il FEM, Iso, DIN and GB, and can be supplied with CE documentation for European projects. The duty class (A3-A5 / M3-M5) is selected according to your actual workload — the number of operating hours per day and the frequency of full-load lifts — so you never pay for unnecessary capacity, and you never undersize the structure.

300 ton double girder gantry crane
| Fattore | Doppia trave | Trave singola |
|---|---|---|
| Capacità nominale | Tipicamente 50 t a 500 t+ | Typically up to 20–32 t |
| Stability and rigidity | Più alto, with lower deflection | Adequate for light duty |
| Hook lifting height | Higher hook position, better use of headroom | Limited by the girder position |
| Dual-hook operation | Main + auxiliary hoist standard | Single hoist, limited options |
| Best suited for | Heavy industry, cantieri navali, piante d'acciaio | Workshop, light storage yards |
For 300-ton applications, a double girder design is the only practical choice.
IL 300 ton double girder gantry crane is widely used in:
Ogni 300 t gantry crane is engineered for its site. Common customization includes:
Before requesting a quote, prepare the following information:
A reputable manufacturer will provide a design drawing, load chart and FEM/ISO calculation report before production, and full after-sales support with spare parts and installation guidance.

Fabbrica Weihua
Q1: How much does a 300 ton double girder gantry crane cost?
UN: The price depends mainly on span, altezza di sollevamento, classe di servizio, control mode and optional equipment. Because every heavy gantry crane is engineered to order, suppliers quote per project — contact us with your requirements for a detailed quotation.
Q2: What is the difference between a gantry crane and an overhead crane?
UN: An overhead crane runs on rails mounted on building walls or columns, while a gantry crane stands on its own legs and runs on ground-level rails. Gantry cranes are ideal for outdoor yards and sites without runway support structures.
Q3: È possibile personalizzare la portata e l'altezza di sollevamento?
UN: SÌ. Standard spans are typically 18–40 m, and shipyard models can reach 89 m or more. Lifting height is customized according to your site, fino a 76 m in shipbuilding applications.
Q4: What standards does the crane comply with?
UN: The crane is designed to FEM, Iso, DIN and GB standards, with CE documentation available for European projects. Duty class is selected based on your actual workload.
Q5: How long is the delivery time?
UN: Delivery depends on configuration and production schedule. Heavy-duty cranes are typically manufactured to order — confirm the lead time with your supplier when you place the order.
UN 300 ton double girder gantry crane is a long-term investment in your production capacity. Choose a manufacturer that provides custom engineering, FEM-verified design, quality manufacturing and reliable after-sales service. Send us your load, span and lifting-height requirements — our engineers will reply within 24 hours with a design proposal and quotation.
Apprezziamo il tuo feedback! Completa il modulo sottostante in modo da poter personalizzare i nostri servizi alle tue esigenze specifiche.
Nostro 16 tonnellate di gru a ponte in vendita si distingue come una soluzione di sollevamento di alto livello, ingegnere……
Scopri di più →
Panoramica del prodotto La gru a portale a braccio singolo è ad alta efficienza, versatile e durevole……
Scopri di più →
Panoramica del prodotto Il 55 tonnellate di gru a cavalletto bitrave è un servizio pesante, ad alta efficienza……
Scopri di più →
Fai clic sul pulsante per ottenere informazioni sul prodotto e citazioni su WhatsApp.
Ottieni una citazione
Ultimi commenti