30 ton double girder overhead crane for steel coil yards. Box girder, VFD control and coil lifting beam for reliable heavy coil handling.
A 30 ton double girder overhead crane is the workhorse of a steel coil yard. It moves heavy coils from the unloading point to the storage area and feeds them to the processing lines, lifting at full rated load every cycle. The machine below is specified around that duty.

30 tons double girder overhead crane for a steel coil yard
Steel coil yards store coils that typically weigh 10–30 tons each, and a full load can pass 40 ton. Work runs in multiple shifts: coils arrive by truck or rail, are stacked in the yard, then delivered to slitting, cut-to-length, pickling or packaging lines. The crane must lift repeatedly at 30 ton, set coils down squarely in narrow aisles and beside conveyor stations, and keep running shift after shift without downtime. That duty rules out a single-girder machine. The double girder design provides the stiffness to carry a wide coil lifting beam at 30 tons and keeps the hook travel steady over the full lifting height.
| Parameter | Nilai |
|---|---|
| Kapasitas pengangkatan yang dinilai | 30 T |
| Menjangkau | 22.5 / 25.5 / 31.5 M (kebiasaan) |
| Ketinggian angkat | 8–16 m (kebiasaan) |
| Duty group | A5–A7 (ISO M5–M7) |
| Kecepatan mengangkat | 0.5–7 m/min (PKS) |
| Kecepatan perjalanan troli | 5–30 m3/mnt |
| Kecepatan perjalanan derek | 20–80 m/min |
| Catu daya | 380 V / 50 Hz, 3-fase (opsional) |
| Modus kontrol | Liontin + wireless remote |
| Suhu kerja | −20 °C hingga +40 ° C. |
| Applicable standards | GB/T 3811, Iso 4301, Fem 1.001 |

30 tons double girder overhead crane for a steel coil yard
Q1: Can the crane lift a coil directly without a beam?
A1: TIDAK. A C-hook or coil lifting beam is required to keep the coil horizontal and prevent edge damage. The crane and the beam are matched at 40 tons during design.
Q2: What span and lifting height are available?
A2: Both are custom to the building. Common spans are 22.5 M, 25.5 m and 31.5 M; lifting heights range from 8 m to 16 M.
Q3: Can it run in an outdoor coil yard?
A3: Ya. With a rain-proof enclosure and corrosion protection it can operate outdoors; wind and temperature conditions are confirmed at the design stage.
Q4: What is the delivery and installation time?
A4: Typical delivery is 60–90 days after drawing confirmation. The supplier’s engineers can carry out installation and commissioning on site.

Pabrik Derek Weihua
Kami menghargai tanggapan Anda! Harap lengkapi formulir di bawah ini sehingga kami dapat menyesuaikan layanan kami dengan kebutuhan spesifik Anda.
Drum tali kawat derek berfungsi sebagai inti pengangkat dan, dalam beberapa kasus, lintasannya……
Temukan lebih banyak →
Sebagai peralatan inti untuk bongkar muat peti kemas di garis depan industri modern…
Temukan lebih banyak →
Sebagai alat pengangkat tugas berat profesional, derek overhead troli ganda (Juga……
Temukan lebih banyak →
Klik tombol untuk mendapatkan informasi produk dan kutipan di whatsapp.
Dapatkan penawaran
Komentar terbaru