400 ton overhead crane used at a hydropower station in Tanzania

400/80 ton overhead crane used at a hydropower station in Tanzania

Latar Belakang Proyek

Julius Nyerere Hydropower Station, located on the Rufiji River in Tanzania, is the country’s largest hydropower project and one of the landmark energy infrastructure projects in East Africa. With a total installed capacity of 2115 MW and nine 235 MW Francis turbine-generator units, the power station is designed to greatly lift Tanzania’s national power supply capacity, support local industrial development and stabilize the regional power grid. The powerhouse requires heavy-duty lifting equipment for the installation, overhaul and maintenance of turbine runners, generator, transformers and other core heavy electromechanical components. To meet the heavy-lifting demands inside the powerhouse, a customized 400 ton overhead crane was deployed for this critical project.

Site Challenges

The project site presents multiple harsh operating conditions that raise high requirements for crane design:

400/80 ton overhead crane used at a hydropower station in Tanzania

400/80 ton overhead crane used at a hydropower station in Tanzania

Crane Solution & Main Specifications

This double-girder 400 ton overhead crane is specially engineered for hydropower powerhouse heavy lifting scenarios.

400/80 ton overhead crane used at a hydropower station in Tanzania

400/80 ton overhead crane used at a hydropower station in Tanzania

Aplikasi & On-site Performance

Itu 400 ton overhead crane undertakes the core heavy-lifting work inside the powerhouse of Julius Nyerere Hydropower Station. It is responsible for the hoisting, transportation and accurate alignment of turbine and generator components during the construction phase. After the station enters commercial operation, the crane serves as the key maintenance equipment for dismounting and reinstalling large rotating parts during scheduled overhaul.

Sejak ditugaskan, the crane has delivered stable, reliable and precise lifting performance. Its anti-sway control greatly improves positioning accuracy when mating large precision equipment. The tropical-adapted structure reduces failure risks under humid and hot environment, cutting downtime and maintenance cost for the power plant owner TANESCO. It has become an indispensable heavy-lifting asset guaranteeing smooth construction and long-term safe operation of this flagship Tanzanian hydropower project.

Nilai & Kesimpulan

Itu 400 ton overhead crane used at the hydropower station in Tanzania provides a proven heavy-lifting solution for Julius Nyerere Hydropower Station. It matches the extreme lifting requirements of large hydropower generating units, adapts to Africa’s tough tropical working environment, and supports the successful delivery and reliable operation of Tanzania’s largest hydropower asset. This case demonstrates mature heavy derek di atas kepala technology applied to African hydropower EPC projects, and proves the reliability of customized heavy lifting equipment for large-scale clean energy infrastructure.

Pabrik Weihua

Artikel prev:
Tidak lebih, Ini sudah menjadi artikel terbaru

Get Solution & Price Right Now!

Kami menghargai tanggapan Anda! Harap lengkapi formulir di bawah ini sehingga kami dapat menyesuaikan layanan kami dengan kebutuhan spesifik Anda.

Nama:
* E-mail:
Whatsapp / Nomor telepon:
Lokasi Proyek:
* Pesan:

Komentar terbaru

Kata Vyacheslav:
Kolektor arus untuk derek EOT
Kata João Dantas:
Halo, Kami sedang mencari pemandu tali kawat pengganti untuk GH yang sudah ada / Derek di atas kepala Univiga. Informasi yang tersedia: * Produsen derek: GH / kesalahan Uni * Kapasitas derek: 3.2 ton * Kerekan / referensi panduan tali: GHA12 * Benang pemandu tali: Tangan kiri * Perkiraan diameter luar: 207 mm * Perkiraan lebar: 50 mm * Kuantitas: 1 pc The original GH spare part has a very long lead time, jadi kami mencari pengganti yang kompatibel. Tidak perlu menjadi bagian GH asli. Pemandu tali yang kompatibel atau dibuat khusus dapat diterima, asalkan dimensinya, arah dan pemasangan ulir cocok untuk hoist GHA12 yang ada. Saat ini kami sedang meminta foto panduan tali asli, papan nama drum dan derek dari pelanggan kami dan dapat mengirimkannya untuk evaluasi teknik Anda. Dapatkah perusahaan Anda memproduksi atau menyediakan pemandu tali kawat yang kompatibel untuk aplikasi ini? Terima kasih.
Hak 100ton Kata:
Silakan buat penawaran untuk pengaitnya 100 ton.
Kata ADRIAN PEÑA:
Aku butuh kait (gaya ganda) kapasitas 25 metrik ton. dengan 4 berkas gandum (14" berkas diameter) diameter tali kawat: 5/8"
Kata Tesfaye Melese:
40 Rakitan Troli Derek Overhead Girder Ganda Ton dengan Aksesori Listrik dan Mekanik lengkap

Kasus terkait

Whatsapp

Hubungi kami

Klik tombol untuk mendapatkan informasi produk dan kutipan di whatsapp.

Dapatkan penawaran
Whatsapp
Pertanyaan