Maison » Produits » Grue au-dessus » 250 Ton Scrap Charging Overhead Crane

250 Ton Scrap Charging Overhead Crane

250 ton scrap charging overhead crane for steel mill converter charging bay. Heavy-duty A7/A8 grade overhead crane with electromagnetic chuck and scrap grab, designed for grabbing, lifting and feeding scrap steel to converters, featuring high safety, high temperature resistance and customizable parameters.

WhatsappEnquête

Le 250 ton scrap charging overhead crane is a heavy-duty, metallurgy-grade overhead travelling crane specially designed for the converter charging bay of steelmaking plants. It serves as the core handling equipment for the steelmaking scrap feeding process, mainly responsible for grabbing, levage, transporting and tipping scrap steel buckets to complete quantitative and efficient scrap charging for converters. Tailored for the high-frequency, high-intensity and harsh working conditions of steelmaking workshops including high temperature, dust pollution and heavy-load continuous operation, this crane supports flexible switching of auxiliary attachments such as electromagnetic chucks and mechanical scrap grabs, realizing integrated operations of bulk scrap steel grabbing, bucket handling and converter feeding, which greatly improves the automation and efficiency of the steelmaking scrap charging process.

250 Ton Scrap Charging Overhead Crane

250 Ton Scrap Charging Overhead Crane

250 Ton Scrap Charging Overhead Crane Performance Parameters

Élément de paramètre
Spécification technique
Capacité de levage nominale
250 Tonne (Crochet principal)
Working Grade
A7 / A8 (Metallurgical Heavy Duty)
Hauteur de levage
Customized 24m – 30m
Portée
Customized 10.5m – 31.5m
Vitesse de levage
0.4 – 10m/min (Fréquence variable réglable)
Vitesse de déplacement du chariot
20 – 40m/min (Fréquence variable réglable)
Vitesse de déplacement de la grue
20 – 40m/min (Fréquence variable réglable)
Matching Attachments
Electromagnetic Chuck / Mechanical Scrap Grab
Environnement applicable
Haute température, poussière, continuous heavy-load operation

Core Working Application & Matching Attachments

This overhead crane is exclusively applied to the converter charging cross operation area in iron and steel smelting enterprises, covering the whole process from scrap yard material transfer to converter furnace feeding. It can be equipped with two mainstream working attachments according to actual production demands to adapt to different scrap steel handling scenarios:

250 Ton Scrap Charging Overhead Crane

250 Ton Scrap Charging Overhead Crane

With dual-attachment switching capability, the crane can independently complete full-process operations including scrap steel loading from the stockyard, precise transportation of scrap buckets, accurate positioning above the converter and automatic tipping feeding, perfectly matching the continuous and high-efficiency production rhythm of modern steelmaking lines.

Conception structurelle & Avantages techniques

Adopting heavy-duty double-girder bridge structure and A7/A8 high working grade design, the crane fully meets the long-term continuous heavy-load operation requirements of metallurgical workshops. The main beam is made of high-strength low-alloy steel, which undergoes integral welding, stress relief annealing and precision machining, featuring high rigidity, strong bearing capacity and small deformation, ensuring stable operation under 250-ton rated load for a long time.

250 Ton Scrap Charging Overhead Crane

The lifting mechanism adopts a dual-hoist redundant design with independent main and auxiliary lifting systems. The main hook undertakes heavy-load lifting of scrap steel buckets, while the auxiliary hook assists in bucket tilting, fine positioning and residual material cleaning, realizing collaborative operation and improving feeding accuracy. All walking and lifting mechanisms are equipped with frequency conversion speed regulation systems, permettant un démarrage en douceur, stop and stepless speed adjustment, effectively preventing load sway and ensuring precise positioning during converter charging.

In view of the harsh metallurgical working environment, the whole machine is designed with high temperature resistance, dust resistance and corrosion resistance. Composants clés tels que les moteurs, reducers and electrical control cabinets adopt industrial high-temperature resistant models, with sealed and dust-proof structures to adapt to high-temperature radiation and dust-filled workshop environments, reducing equipment failure rate and extending service life.

Système de protection de sécurité complet

As key high-risk equipment for steelmaking production, this 250-ton scrap charging overhead crane is equipped with full redundant safety protection devices to ensure zero-risk operation in heavy-load and high-temperature scenarios:

250 Ton Scrap Charging Overhead Crane Advantages & Valeur

This 250-ton scrap charging overhead crane integrates high load capacity, high efficiency and high safety, perfectly matching the intensive production mode of modern steel mills. The flexible switching of electromagnetic chuck and scrap grab realizes full coverage of various scrap steel materials, greatly improving scrap feeding efficiency and reducing manual intervention. The high-grade heavy-duty structure and environmental adaptive design ensure stable long-term operation, reduce equipment maintenance frequency and production downtime. The intelligent monitoring and precise control system improve the accuracy of converter charging, stabilize steelmaking quality, and effectively reduce production costs, becoming an indispensable core handling equipment for medium and large steelmaking converter production lines.

FAQ: 250 Ton Scrap Charging Overhead Crane

Q1: What is the main application scenario of the 250 ton scrap charging overhead crane?

A1: This heavy-duty overhead crane is specially customized for the converter charging bay of steelmaking plants. It is mainly used for grabbing, lifting and transporting scrap steel buckets, and completing accurate scrap steel feeding operations for steelmaking converters, adapting to high-frequency, continuous heavy-load operation in harsh steel workshop environments.

Q2: What attachments can this scrap charging overhead crane be equipped with?

A2: It supports two core matching attachments for flexible switching: electromagnetic chucks and mechanical scrap grabs. The electromagnetic chuck is suitable for bulk, fragmented and thin-plate scrap steel rapid grabbing, while the mechanical grab is ideal for large-size, heavy and irregular scrap steel materials, covering all conventional scrap steel handling needs.

Q3: What working grade does this metallurgical scrap charging overhead crane adopt?

A3: The crane adopts A7/A8 heavy-duty working grade, which is the professional standard for metallurgical high-intensity operation. It can adapt to long-term uninterrupted heavy-load work in high-temperature, dusty steelmaking workshops, with strong durability and stable continuous operation performance.

T4: Does the crane have complete safety protection functions?

A4: Oui. It is equipped with a full set of redundant safety systems, including dual backup brake system, multi-layer limit protection (surcharge, hauteur de levage, limite de déplacement), real-time intelligent operation monitoring system, load anti-sway system and emergency stop power-off protection device, fully eliminating operation risks in heavy-load metallurgical scenarios.

Q5: Are the parameters of the scrap charging overhead crane customizable?

A5: Core parameters such as lifting height, crane span and operating speed can be customized according to the actual size of the user’s converter workshop and production process requirements, to achieve the best matching with on-site production conditions.

Q6: What environmental adaptability does the equipment have?

A6: All key components adopt high-temperature resistant, dust-proof and sealed anti-corrosion design, which can stably resist high-temperature radiation, workshop dust and harsh industrial environment erosion, effectively reduce failure rate and extend the overall service life of the equipment.

Get Solution & Price Right Now!

Nous apprécions vos commentaires! Veuillez remplir le formulaire ci-dessous afin que nous puissions adapter nos services à vos besoins spécifiques.

Nom:
* E-mail:
Whatsapp / Numéro de téléphone:
Emplacement du projet:
* Message:

Dernières commentaires

Ricardo Aguilar a dit:
Pour un projet de reconditionnement de grue, Nous devons installer une unité de climatisation sur votre site Web, nous avons trouvé cette solution. Capacité de refroidissement: 2.5 KW un 7.0 KW (8,500 un 24,000 BTU/heure) Capacité de chauffage (Facultatif): 2.0 KW un 6.0 KW Fuente de alimentación: 24À Washington DC / 110V y / 230V y / 415V y, 50/60 HZ (Préciser l'exigence) Réfrigérateur: R410A ou R134a écologique
Dit:
CAPACITÉ 50 TON AKS ARALIK 40 MÈTRE 12 METRE KANCA ALTI RAY BOYU 250 MÈTRE, 2 QTÉ GRUE À PORTAIL
Hubert Patino a dit:
Chères grues Weihua, salutations de la part de GPANTEC SAC, situé à Lima, Pérou. Nous aimerions demander un devis pour une poulie ouvrière de 12 tonnes fabriquée par vos soins. Le code de référence du produit ou le numéro de série du pont roulant est 110220.075, et le modèle de bloc d'arrachage est 12/2t-40M. Une image du bloc d'arraché que nous demandons est jointe. La quantité demandée est d'un kit. Nous attendons votre aimable attention. Sincèrement.
La grange Saïd:
Cher Monsieur ou Madame, Nous recherchons actuellement un fournisseur pour un système de rails conducteurs fermés pour palans électriques à chaîne fonctionnant sur des voies monorail.. Veuillez fournir votre devis pour l'exigence suivante: Project Scope Quantity: 8 independent lines Length: 80 meters per line Total length: 640 meters Electrical Requirements Supply voltage: 400 VAC Frequency: 50 Hz Number of poles: 4 Courant nominal: minimum 40 A Application Electric chain hoist Safe Working Load (SWL): 2,500 kg One hoist per line Outdoor industrial installation Protection Requirements Minimum protection class: IP43 Preferred protection class: IP54 or higher Please include in your offer Conductor rails Power feed sections Joint assemblies End caps Hangers and support brackets Current collectors Expansion sections if required Complete accessory list Documentation Required Technical datasheets. Confirmation écrite de l'indice de protection IP du système complet. Certificats de test ou rapports de laboratoire démontrant la conformité aux exigences IP43/IP54. Références d'installation pour grue similaire, monorail, ou applications de levage. Veuillez également indiquer: Délai de livraison. Pays de fabrication. Période de garantie. Inccoter. Détail des prix par ligne et pour le projet complet. Merci d'avance, La grange Cédric
HESHAM M FARGHALY a dit:
Dear Sir Please send your quot. Pour le moufle à crochet suivant: Bloc à crochet 45 tons Application: over head travelling crane Hook block type - four sheaves Hook type: Crochet de grue forgée . Capacité: 45 tonnes métriques (SWL) Configuration: Queue unique - swivel Design standard: EN 13001‑3‑5 Material: Acier allié forgé (Q&T) Facteur de sécurité: ≥ 4:1 Certification: DANS / CE / 3.1 material certificate SIMILAR TO ATTACHED DRAWING (je l'enverrai par email à info@craneihua.com) N.-B.. 1-Prix: filet - ex-travail 2- poids d'expédition & dimensions. 3- certificat d'essai 4- certificat d'origine

Produit chaud

Cas connexes

Whatsapp

Contactez-nous

Cliquez sur le bouton pour obtenir des informations et des citations de produits sur WhatsApp.

Obtenez un devis
Whatsapp
Enquête