Contexte du projet

Julius Nyerere Hydropower Station, located on the Rufiji River in Tanzania, is the country’s largest hydropower project and one of the landmark energy infrastructure projects in East Africa. With a total installed capacity of 2115 MW and nine 235 MW Francis turbine-generator units, the power station is designed to greatly lift Tanzania’s national power supply capacity, support local industrial development and stabilize the regional power grid. The powerhouse requires heavy-duty lifting equipment for the installation, overhaul and maintenance of turbine runners, générateurs, transformers and other core heavy electromechanical components. To meet the heavy-lifting demands inside the powerhouse, a customized 400 ton overhead crane was deployed for this critical project.

Site Challenges

The project site presents multiple harsh operating conditions that raise high requirements for crane design:

400/80 ton overhead crane used at a hydropower station in Tanzania

400/80 ton overhead crane used at a hydropower station in Tanzania

Crane Solution & Main Specifications

This double-girder 400 ton overhead crane is specially engineered for hydropower powerhouse heavy lifting scenarios.

400/80 ton overhead crane used at a hydropower station in Tanzania

400/80 ton overhead crane used at a hydropower station in Tanzania

Application & On-site Performance

Le 400 ton overhead crane undertakes the core heavy-lifting work inside the powerhouse of Julius Nyerere Hydropower Station. It is responsible for the hoisting, transportation and accurate alignment of turbine and generator components during the construction phase. After the station enters commercial operation, the crane serves as the key maintenance equipment for dismounting and reinstalling large rotating parts during scheduled overhaul.

Depuis la mise en service, the crane has delivered stable, reliable and precise lifting performance. Its anti-sway control greatly improves positioning accuracy when mating large precision equipment. The tropical-adapted structure reduces failure risks under humid and hot environment, cutting downtime and maintenance cost for the power plant owner TANESCO. It has become an indispensable heavy-lifting asset guaranteeing smooth construction and long-term safe operation of this flagship Tanzanian hydropower project.

Valeur & Conclusion

Le 400 ton overhead crane used at the hydropower station in Tanzania provides a proven heavy-lifting solution for Julius Nyerere Hydropower Station. It matches the extreme lifting requirements of large hydropower generating units, adapts to Africa’s tough tropical working environment, and supports the successful delivery and reliable operation of Tanzania’s largest hydropower asset. This case demonstrates mature heavy pont roulant technology applied to African hydropower EPC projects, and proves the reliability of customized heavy lifting equipment for large-scale clean energy infrastructure.

Usine Weihua

Article précédent:
Pas plus, C'est déjà le dernier article

Get Solution & Price Right Now!

Nous apprécions vos commentaires! Veuillez remplir le formulaire ci-dessous afin que nous puissions adapter nos services à vos besoins spécifiques.

Nom:
* E-mail:
Whatsapp / Numéro de téléphone:
Emplacement du projet:
* Message:

Dernières commentaires

Viatcheslav a dit:
Collecteur de courant pour grue EOT
João Dantas a dit:
Bonjour, Nous recherchons un guide-câble de remplacement pour un GH existant. / Pont roulant Univiga. Informations disponibles: * Fabricant de grues: GH / Erreur universitaire * Capacité de la grue: 3.2 tonnes * Hisser / référence du guide-corde: GHA12 * Fil de guidage de corde: Gauche * Diamètre extérieur approximatif: 207 MM * Largeur approximative: 50 MM * Quantité: 1 pc The original GH spare part has a very long lead time, nous recherchons donc un remplacement compatible. Il n'est pas nécessaire qu'il s'agisse d'une pièce d'origine GH. Un guide-corde compatible ou fabriqué sur mesure est acceptable, à condition que les dimensions, la direction du filetage et l'installation conviennent au palan GHA12 existant. Nous demandons actuellement des photos du guide-corde original, plaque signalétique du tambour et de la grue de notre client et pouvons les envoyer pour votre évaluation technique. Votre entreprise peut-elle fabriquer ou fournir un guide-câble compatible pour cette application? Merci.
Hak 100 tonnes a dit:
Merci de faire une offre pour le crochet 100 tonne.
ADRIAN PEÑA a dit:
J'ai besoin d'un crochet (double style) capacité 25 tonnes métriques. avec 4 gerbes (14" réas de diamètre) diamètre du câble métallique: 5/8"
Tesfaye Melese a dit:
40 Ensemble de chariot à pont roulant à double poutre de tonne avec accessoires électriques et mécaniques complets

Cas connexes

Whatsapp

Contactez-nous

Cliquez sur le bouton pour obtenir des informations et des citations de produits sur WhatsApp.

Obtenez un devis
Whatsapp
Enquête