Hogar » Blog » 400 Ton Overhead Crane Used at a Hydropower Station in Tanzania

400 Ton Overhead Crane Used at a Hydropower Station in Tanzania

2026-11-18

400 ton overhead crane used at a hydropower station in Tanzania

400/80 ton overhead crane used at a hydropower station in Tanzania

Antecedentes del proyecto

Julius Nyerere Hydropower Station, located on the Rufiji River in Tanzania, is the country’s largest hydropower project and one of the landmark energy infrastructure projects in East Africa. With a total installed capacity of 2115 MW and nine 235 MW Francis turbine-generator units, the power station is designed to greatly lift Tanzania’s national power supply capacity, support local industrial development and stabilize the regional power grid. The powerhouse requires heavy-duty lifting equipment for the installation, overhaul and maintenance of turbine runners, generadores, transformers and other core heavy electromechanical components. To meet the heavy-lifting demands inside the powerhouse, a customized 400 ton overhead crane was deployed for this critical project.

Site Challenges

The project site presents multiple harsh operating conditions that raise high requirements for crane design:

400/80 ton overhead crane used at a hydropower station in Tanzania

400/80 ton overhead crane used at a hydropower station in Tanzania

Crane Solution & Main Specifications

This double-girder 400 ton overhead crane is specially engineered for hydropower powerhouse heavy lifting scenarios.

400/80 ton overhead crane used at a hydropower station in Tanzania

400/80 ton overhead crane used at a hydropower station in Tanzania

Solicitud & On-site Performance

El 400 ton overhead crane undertakes the core heavy-lifting work inside the powerhouse of Julius Nyerere Hydropower Station. It is responsible for the hoisting, transportation and accurate alignment of turbine and generator components during the construction phase. After the station enters commercial operation, the crane serves as the key maintenance equipment for dismounting and reinstalling large rotating parts during scheduled overhaul.

Desde la puesta en servicio, the crane has delivered stable, reliable and precise lifting performance. Its anti-sway control greatly improves positioning accuracy when mating large precision equipment. The tropical-adapted structure reduces failure risks under humid and hot environment, cutting downtime and maintenance cost for the power plant owner TANESCO. It has become an indispensable heavy-lifting asset guaranteeing smooth construction and long-term safe operation of this flagship Tanzanian hydropower project.

Valor & Conclusión

El 400 ton overhead crane used at the hydropower station in Tanzania provides a proven heavy-lifting solution for Julius Nyerere Hydropower Station. It matches the extreme lifting requirements of large hydropower generating units, adapts to Africa’s tough tropical working environment, and supports the successful delivery and reliable operation of Tanzania’s largest hydropower asset. This case demonstrates mature heavy puente grúa technology applied to African hydropower EPC projects, and proves the reliability of customized heavy lifting equipment for large-scale clean energy infrastructure.

Fábrica de Weihua

Artículo anterior:
No más, Ya es el artículo más nuevo

Get Solution & Price Right Now!

Valoramos sus comentarios! Complete el formulario a continuación para que podamos adaptar nuestros servicios a sus necesidades específicas..

Nombre:
* Correo electrónico:
Whatsapp / Número de teléfono:
Ubicación del proyecto:
* Mensaje:

Últimos comentarios

Viacheslav dijo:
Colector de corriente para puente grúa
João Dantas Said:
Hola, Estamos buscando una guía de cable de repuesto para un GH existente / Puente grúa Univiga. Información disponible: * fabricante de grúas: GH / error universal * Capacidad de la grúa: 3.2 montones * Izar / referencia de guía de cuerda: GHA12 * Hilo guía de cuerda: mano izquierda * Diámetro exterior aproximado: 207 mm * Ancho aproximado: 50 mm * Cantidad: 1 pc The original GH spare part has a very long lead time, entonces estamos buscando un reemplazo compatible. No es necesario que sea una pieza original de GH.. Se acepta una guía de cuerda compatible o fabricada a medida., siempre que las dimensiones, La dirección de rosca y la instalación son adecuadas para el polipasto GHA12 existente.. Actualmente estamos solicitando fotos de la guía de cuerda original., placa de identificación del tambor y la grúa de nuestro cliente y podemos enviarla para su evaluación de ingeniería. ¿Puede su empresa fabricar o suministrar una guía de cable compatible para esta aplicación?? Gracias.
Hak 100 toneladas dijo:
Por favor haga una oferta por el gancho. 100 tonelada.
ADRIÁN PEÑA Dijo:
necesito gancho (doble estilo) capacidad 25 toneladas métricas. con 4 gavillas (14" poleas de diámetro) diámetro del cable: 5/8"
Tesfaye Melese dijo:
40 Conjunto de carro de grúa aérea de doble viga de tonelada con accesorios eléctricos y mecánicos completos

Casos relacionados

Whatsapp

Contáctenos

Haga clic en el botón para obtener información del producto y cotizaciones en WhatsApp.

Obtener una cotización
Whatsapp
Consulta