Projekthintergrund

Julius Nyerere Hydropower Station, located on the Rufiji River in Tanzania, is the country’s largest hydropower project and one of the landmark energy infrastructure projects in East Africa. With a total installed capacity of 2115 MW and nine 235 MW Francis turbine-generator units, the power station is designed to greatly lift Tanzania’s national power supply capacity, support local industrial development and stabilize the regional power grid. The powerhouse requires heavy-duty lifting equipment for the installation, overhaul and maintenance of turbine runners, Generatoren, transformers and other core heavy electromechanical components. To meet the heavy-lifting demands inside the powerhouse, a customized 400 ton overhead crane was deployed for this critical project.

Site Challenges

The project site presents multiple harsh operating conditions that raise high requirements for crane design:

400/80 ton overhead crane used at a hydropower station in Tanzania

400/80 ton overhead crane used at a hydropower station in Tanzania

Crane Solution & Main Specifications

This double-girder 400 ton overhead crane is specially engineered for hydropower powerhouse heavy lifting scenarios.

400/80 ton overhead crane used at a hydropower station in Tanzania

400/80 ton overhead crane used at a hydropower station in Tanzania

Anwendung & On-site Performance

Der 400 ton overhead crane undertakes the core heavy-lifting work inside the powerhouse of Julius Nyerere Hydropower Station. It is responsible for the hoisting, transportation and accurate alignment of turbine and generator components during the construction phase. After the station enters commercial operation, the crane serves as the key maintenance equipment for dismounting and reinstalling large rotating parts during scheduled overhaul.

Seit Inbetriebnahme, the crane has delivered stable, reliable and precise lifting performance. Its anti-sway control greatly improves positioning accuracy when mating large precision equipment. The tropical-adapted structure reduces failure risks under humid and hot environment, cutting downtime and maintenance cost for the power plant owner TANESCO. It has become an indispensable heavy-lifting asset guaranteeing smooth construction and long-term safe operation of this flagship Tanzanian hydropower project.

Wert & Abschluss

Der 400 ton overhead crane used at the hydropower station in Tanzania provides a proven heavy-lifting solution for Julius Nyerere Hydropower Station. It matches the extreme lifting requirements of large hydropower generating units, adapts to Africa’s tough tropical working environment, and supports the successful delivery and reliable operation of Tanzania’s largest hydropower asset. This case demonstrates mature heavy Laufkran technology applied to African hydropower EPC projects, and proves the reliability of customized heavy lifting equipment for large-scale clean energy infrastructure.

Weihua-Fabrik

Vorab -Artikel:
Nicht mehr, Es ist bereits der neueste Artikel

Get Solution & Price Right Now!

Wir schätzen Ihr Feedback! Bitte füllen Sie das folgende Formular aus, damit wir unsere Dienste auf Ihre spezifischen Anforderungen anpassen können.

Name:
* E-Mail:
WhatsApp / Telefonnummer:
Projektort:
* Nachricht:

Neueste Kommentare

Wjatscheslaw sagte:
Stromabnehmer für EOT-Kran
João Dantas sagte:
Hallo, Wir suchen eine Ersatz-Drahtseilführung für eine bestehende GH / Univiga-Laufkran. Verfügbare Informationen: * Kranhersteller: GH / Uni-Fehler * Krankapazität: 3.2 Tonnen * Hissen / Referenz zur Seilführung: GHA12 * Seilführungsfaden: Linkshänder * Ungefährer Außendurchmesser: 207 mm * Ungefähre Breite: 50 mm * Menge: 1 pc The original GH spare part has a very long lead time, Daher sind wir auf der Suche nach einem kompatiblen Ersatz. Es muss kein Originalteil von GH sein. Eine kompatible oder individuell angefertigte Seilführung ist akzeptabel, vorausgesetzt, dass die abmessungen, Gewinderichtung und Montage sind für den vorhandenen GHA12-Hebezeug geeignet. Wir bitten derzeit um Fotos der originalen Seilführung, Sie erhalten von unserem Kunden die Typenschilder der Trommel und des Krans und können diese zur technischen Bewertung einsenden. Kann Ihr Unternehmen für diese Anwendung eine kompatible Drahtseilführung herstellen oder liefern?? Danke.
Hak 100ton sagte:
Bitte machen Sie ein Angebot für den Haken 100 Tonne.
ADRIAN PEÑA Sagte:
Ich brauche einen Haken (Doppelter Stil) Kapazität 25 metrische Tonnen. mit 4 Garben (14" Durchmesser Scheiben) Drahtseildurchmesser: 5/8"
Tesfaye Melese sagte:
40 Tonnen-Doppelträger-Brückenkran-Laufkatzenbaugruppe mit komplettem elektrischen und mechanischen Zubehör

Verwandte Fälle

WhatsApp

Kontaktieren Sie uns

Klicken Sie auf die Schaltfläche, um Produktinformationen und Angebote auf WhatsApp zu erhalten.

Holen Sie sich Zitat
WhatsApp
Anfrage