High-performance 300 Ton Double Girder Overhead Crane for heavy-duty industrial lifting. Featuring strong load capacity, variable frequency speed control, عملية مستقرة, and complete safety devices. Ideal for shipbuilding, المعادن, power plants and heavy machinery manufacturing. فترة مخصصة, lifting height and dual control modes available.
ال 300 ton double girder overhead crane is a heavy-duty, high-efficiency industrial lifting equipment designed for ultra-heavy load handling in large-scale industrial scenarios. Manufactured in strict accordance with GB/T3811 national standards and European FEM, DIN industrial specifications, this crane integrates optimized structural design, mature frequency conversion control technology and comprehensive safety protection systems. It is specially developed to solve the lifting and transshipment demands of 300-ton super-heavy materials, equipment and components, featuring stable operation, قدرة تحمل قوية, high precision and excellent durability. As a core handling equipment for heavy industry, it can adapt to long-term continuous high-intensity operation and effectively improve industrial production and hoisting efficiency.

This double girder overhead crane adopts a mature and reliable box-type bias-rail double main girder structure, which is the key to realizing ultra-heavy load bearing. The two parallel high-strength box girders evenly disperse the heavy load, completely avoiding stress concentration and greatly improving the overall rigidity and stability of the equipment compared with single-girder cranes.
The main girders are connected with high-precision end beams via high-strength integral bolts. Processed by professional precision processing equipment, the connecting surfaces achieve high matching accuracy, ensuring no deviation during long-distance operation and smooth trolley traveling. The end beam adopts an integral torsion-resistant box structure, which effectively resists torsion and vibration during heavy-load operation and enhances the overall structural stability of the crane.
The complete equipment set includes main girders, عربات نهاية, traveling operating mechanism, heavy-duty electric wire rope hoist trolley, electrical control system and multi-dimensional safety protection devices. The overall structure is compact and optimized, with reasonable force distribution, convenient disassembly, النقل والتركيب في الموقع, and low later maintenance cost.

1. Super Strong Load-Bearing & عملية مستقرة
2. Intelligent Variable Frequency Control & دقة عالية
3. متين & صيانة منخفضة
4. توفير الطاقة & توفير المساحة
Optimized lightweight structural design reduces the self-weight of the crane and wheel pressure on the factory building track, lowering the requirements for factory building bearing and track foundation. The compact overall structure makes full use of the vertical and horizontal space of the workshop, effectively saving plant space, while the efficient transmission system reduces energy consumption and realizes energy-saving and environmentally friendly operation.

Safety is the core design priority of the 300-ton heavy-duty overhead crane. The equipment is equipped with a full set of multi-layer safety protection devices to eliminate operational risks in all directions:
|
غرض
|
Technical Specification
|
|---|---|
|
قدرة الرفع المقدرة
|
300 طن
|
|
رفع الارتفاع
|
Customized 12m – 36m
|
|
فترة
|
10.5م – 31.5 م (قابلة للتخصيص)
|
|
سرعة رفع
|
0.5 – 3m/min (Variable Frequency Stepless Speed Regulation)
|
|
عربة السفر عربة
|
2 – 20m/min (تردد متغير)
|
|
سرعة السفر الرافعة
|
3 – 30m/min (تردد متغير)
|
|
واجب العمل
|
A5 – A7 Heavy Duty
|
|
وضع التحكم
|
التحكم في الكابينة / التحكم عن بعد / التحكم المزدوج
|
|
Working Environment
|
-20℃ ~ +45℃, Indoor/ Semi-outdoor
|
This 300-ton double girder overhead crane is widely applicable to heavy-duty industrial fields that require ultra-heavy load handling. It is the preferred lifting equipment for large manufacturing and engineering projects, including heavy machinery manufacturing, steel structure processing, power station equipment installation, bridge engineering construction, shipbuilding workshop, metallurgical workshop, mining equipment maintenance and large warehouse heavy cargo transshipment. It can stably complete the hoisting, يتحرك, positioning and assembly of super-heavy workpieces, effectively supporting high-efficiency and safe production of heavy industry.
We provide one-stop full-cycle services including product customization, تصميم, إنتاج, التثبيت في الموقع, commissioning and technical training. All cranes enjoy a one-year full warranty and lifelong maintenance services. We have a professional after-sales team and complete spare parts supply system to quickly respond to customer demands, solve equipment operation faults and daily maintenance problems, and ensure the long-term stable and efficient operation of the equipment.
نحن نقدر ملاحظاتك! يرجى إكمال النموذج أدناه حتى نتمكن من تخصيص خدماتنا حسب احتياجاتك المحددة.
الرافعة العلوية ذات العارضة المزدوجة ذات الرافعة عالية الكفاءة, مادة شديدة التحمل ح……
اكتشف المزيد →
في مجال التعامل مع المواد الثقيلة, 70 طن من الرافعات الجسرية الآلية تبرز……
اكتشف المزيد →
تحميل بيانات الرافعة الجسرية WEIHUA pdf: تحميل مصممة بشعاع واحد وكهربائي……
اكتشف المزيد →
أحدث التعليقات